more details
[web/gag.com] / rockets / airframes / 2YikStik / buildlog.mdwn
1 # 2YikStik Build Steps
2
3         + fins
4                 + vacuum bag fins with CF and glass
5                 + sand fins to finished shape
6
7         + coupler
8                 + cut two 1" rings of coupler for locking airframe bulkhead
9                 + cut phenolic coupler for zipperless snout
10                 + vacuum bag a layer of CF to the inside of zipperless snout
11
12         + cut airframe section for fin can
13                 + rough cut on chop saw
14                 + square ends on lathe
15
16         + cut centering rings and bulkheads for airframe
17                 + 2 fin-lock thick rings
18                 + 1 zipperless ring
19                 + 1 bay divider bulkhead
20
21         + fabricate fin positioning jig
22
23         + fin can
24                 + scribe a reference line along MMT tube
25                 + drill forward fin-lock ring for TM antenna and charge wires
26                 + locate and epoxy forward fin-lock ring in place
27                 + tack fins in place on MMT, dry-fitting aft fin-lock ring
28                   and using jig to aid alignment
29                 + mask fins at airframe ID, and MMT at rear ring leading edge
30                 + apply fin to fin glass
31                 + mark and cut fin slots in fin can airframe tube
32
33                 + prepare two terminal strips with leads for aft charges
34                 + install terminal strips on zipperless coupler ring
35
36                 + mark and cut hatch in fin can airframe tube
37
38                 + cut phenolic coupler section to form ebay lip
39                 + mark coupler for access hatch
40                 + drill hatch and coupler for hold-down screws
41                 + cut access hatch in coupler section
42                 + install blind nuts in coupler section for hatch screws
43                 + countersink hatch for flat-head screws
44                 + install a thermistor in MMT near aft end
45
46                 + install coupler section over electronics
47                 + install fin can airframe, aft ring dry-fit only
48                 + install zipperless coupler
49                 + install zipperless coupler forward ring, routing wires aft
50
51                 + install aft ring
52                 + install tail cone
53
54                 + fin to airframe exterior fillets
55
56                 + mount electronics in fin can
57                 + attach fin and MMT thermistors to TeleScience
58                 + install final thermistor in airframe, attach to TeleScience
59
60                 + mark and drill hatch for static port positioned to allow
61                   operation of power switch
62
63         - airframe
64                 + fit eye nuts to 1/4-20 rod through bulkhead using fender 
65                 + install Pro75 6xl case with forward closure attached in
66                   completed fin can
67                 + measure forward-most extent of eye bolt on motor from 
68                   airframe seating surface on fin can to know where to put 
69                   the bulkhead
70
71                         29" from airframe rear to bulkhead aft face
72
73                 + epoxy bulkhead in airframe with coupler rings fore and aft
74
75                 + load main chute and related recovery components to determine
76                   required length of forward bay aft of nose cone
77                 + mark and cut airframe to length
78
79                 + machine a pair of 1515 rail buttons for countersunk screws
80                 + drill and tap aft fincan ring and airframe bulkhead for
81                   1/4-20 rail button screws
82                 - vent holes in fore and aft bays
83                 - drill and tap for 2-56 nylon shear pins forward and aft
84
85         - nose cone
86                 + pick up nose cone from Jeff Lane
87                 + cut ring and bulkhead
88                 + dry-fit ring and bulkhead in nose cone, mark and drill
89                   for attachment screws
90                 + install T-nuts in ring
91                 + epoxy ring in place
92                 + fabricate sled structure and attach to bulkhead
93                 + install electronics on sled
94                         + TM v1.1
95                         + TeleScience
96                         + 900mAh lipo
97                         + power switch
98                 + static vent hole
99                 + install 4-screw strip on bulkhead for forward charges
100                 + attach embedded thermistor wires to TeleScience board
101                 - replace t-nut that got pushed out of ring
102                 - clean up threads on all 4 t-nuts
103
104         - ground test
105                 - verify electronics
106                         - forward TeleScience .. make sure chan 2 not in use
107                 - load airframe as if for flight
108                 - verify RF connectivity to both electronics setups
109                 - prep and fire forward and aft charges to confirm deployment
110
111         - paint
112                 - prime fin can and airframe
113                 - sand as smooth as possible
114                 - paint fin can black
115                 - paint patch on front of airframe black
116                 - apply "2YikStik" mask over black area
117                 - paint airframe gold
118                 - remove mask from lettering
119                 - sand everything with wet/dry paper, polish
120                 - purple Altus Metrum decal on airframe tube
121                 - holographic decals on two fins?
122                 
123                 - Jeff's nose cone to be left unpainted for video, 
124                   maybe paint it gloss red later
125