TeleMega v0.3 proto build
[web/altusmetrum] / production.mdwn
1 # Altus Metrum Units Constructed
2
3 This page contains Bdale's notes about each unit of [TeleMetrum](TeleMetrum/) 
4 and [TeleDongle](TeleDongle/) assembled to date.
5
6 ## sn 1 ##
7
8 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
9 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
10 ground.  R17 replaced with short circuit, R18 removed.
11
12 Installed in Bdale's Vertical Assault.  First unit to be flown on 
13 2009.04.19, on a Cesaroni J335.
14
15 Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
16 2009.07.18 with a MAWD as backup.  The first dual-deploy flight with a TM
17 board in control of ejection charges!
18
19 ## sn 2 ##
20
21 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
22 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
23 ground.
24
25 Delivered to Keith Packard for firmware development and use.  Flown twice
26 on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors.
27
28 Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload.  The
29 ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
30 and screw terminal block connectors got more or less torn off, but the rest
31 of the board survived and good data was recovered from the flight.
32
33 Repaired by Bdale, sent back to Keith on 7 July 2009.  Keith reported the
34 baro sensor as flakey, it was replaced in October 2009 prior to 
35 NCR Octoberfest.
36
37 ## sn 3 ##
38
39 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
40 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
41 from each to ground.
42
43 Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never
44 flown there.
45
46 Pulled and given to Keith to take home from Mayhem.
47
48 Lost in Keith's Nike which was lost for a while after an apparently nominal 
49 flight in June 2009 at Brothers, Oregon.  Rocket was later found and this unit
50 is reportedly still in good condition.
51
52 ## sn 4 ##
53
54 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
55 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
56 from each to ground.
57
58 Installed in Robert's Lil Nuke.
59
60 Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
61 both it and the electronics sled came out at apogee and were not recovered.
62
63 ## sn 5 ##
64
65 Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial 
66 connector for use as TeleDongle or for TeleTerra prototype.
67
68 Bdale's TeleDongle.
69
70 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
71
72 ## sn 6 ##
73
74 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
75
76 Keith's TeleDongle.
77
78 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
79
80 ## sn 7 ##
81
82 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
83 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
84 from each to ground.
85
86 Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
87 in October 2009 as replacement.
88
89 ## sn 8 ##
90
91 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
92 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
93 from each to ground.
94
95 Delivered to Keith in early November 2009.
96
97 ## sn 9 ##
98
99 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
100 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
101 from each to ground.
102
103 Installed in Bdale's Trick-o-Treat 98mm airframe.
104
105 ## sn 10 ##
106
107 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
108 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
109 from each to ground.
110
111 Installed in Robert's Lil Nuke.
112
113 ## sn 11 ##
114
115 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
116 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
117 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
118
119 In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
120 Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
121
122 Beeper failed after a hard landing, replaced 2010.02.06.
123
124 ## sn 12 ##
125
126 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
127 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
128 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
129
130 ## sn 13 ##
131
132 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
133 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
134 from each to ground.
135
136 Modified 2009.11.20 to:
137
138 * use TC1055-3.3VCT713 100ma regulator proposed for v0.2
139 * route 3.3V instead of v_lipo to the serial connector for SkyTraq GPS
140 * use v_lipo for pyro voltage instead of 5V with 1000uF capacitor
141 * added 100uF 1206 capacitor on 3.3V rail
142
143 In this configuration, flew two textbook perfect flights on 2009.11.21 at
144 Hudson Ranch in Trick-O-Treat on J motors.
145
146 Modified 2011.11.13 to:
147
148 * test ADXL78 accelerometer functionality for v1.2 build
149 * use 3.3k instead of 10k for R2 and R3, to eliminate power-on pyro glitching
150
151 ## sn 14 ##
152
153 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
154 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
155 from each to ground.
156
157 Modified 2010.10.18:
158
159 * R10 changed to 27k to allow keithp to test use of 1.25V ADC internal 
160   reference with the accelerometer
161
162 Delivered to keithp on 2010.10.19.
163
164 Modifed by keithp on 2011.03.30 to have 3.3V on the serial connector power pin.
165
166 ## sn 15 ##
167
168 Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
169
170 ## sn 16 ##
171
172 Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
173
174 ## sn 17-21 ##
175
176 Full load of TeleMini v0.1 PCBs on 2011.03.07.  Minor variations due to 
177 parts availability, as follows:
178
179 * sn 17-18 have TXC oscillators, sn 19-21 have Abracom
180 * sn 21 is missing the dual LED 
181
182 ## sn 25-26 ##
183
184 Full load of TeleTerra v0.1 PCBs on 2010.10.31
185
186 ## sn 27-31 ##
187
188 Full load of TeleNano v0.1 PCBs on 201103.09.  sn 27 has TXC oscillator, all
189 others have Abracom, no other significant variations.
190
191 ## sn 32-33 ##
192
193 Full load of TeleMini v0.2 PCBs on 2011.05.04.
194
195 ## sn 34-36 ##
196
197 Full load of TeleScience v0.1 PCBs on 2011.05.05.
198
199 ## sn 37-38 ##
200
201 Full load of TeleBT v0.1 PCBs on 2011.05.06.
202
203 ## sn 39-42 ##
204
205 Full load of TelePyro v0.1  PCBs on 2011.09.20, except only sn 39 and 40
206 have magnetic sensors since I only have two samples of the now-obsolete part.
207
208 ## sn 43-45 ##
209
210 Full load of TeleScience v0.1 PCBs on 2011.09.22.
211
212 ## sn 46-48 ##
213
214 Full load of TeleTerra v0.2 PCBs on 2011.10.23.
215
216 ## sn 49-50 ##
217
218 Full load of TeleShield v0.1 PCBs on 2012.01.03, using 3.15V reset controller
219 and the less-good crystals.
220
221 ## sn 51 ##
222
223 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 100g accel and screw 
224 terminals.
225
226 Installed in G-Spot on 2010.02.06.
227
228 ## sn 52 ##
229
230 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 50g accel and Tyco header.
231
232 Went home with Keith from LCA 2010 in Wellington.
233
234 ## sn 53 ##
235
236 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 40g accel and screw 
237 terminals.
238
239 ## sn 54-56 ##
240
241 Prototypes of TeleMetrum v1.1 loaded with the newer Venus 638 chips for 
242 evalutation, loaded as part of the production v1.1 run by 
243 [Advanced Circuits](http://4pcb.com), received 2011.01.06.
244
245 ## sn 57-60 ##
246
247 Full load of TeleBT v0.2 PCBs on 2012.01.07.
248
249 ## sn 61-63 ##
250
251 Full load of TeleShield v0.1 PCBs on 2012.01.13.
252
253 ## sn 64-65 ##
254
255 MegaMetrum v0.1 PCBs on 2012.03.31, with 2 megabyte flash parts and no 
256 high-g accel.
257
258 ## sn 66 ##
259
260 TeleFire v0.1 PCB built by Keith on 2012.08.23.
261
262 ## sn 67 ##
263
264 TeleLCO v0.1 PCB built by Keith on 2012.08.26.
265
266 ## sn 68-70 ##
267
268 MegaMetrum v0.1 PCBs on 2012.08.28.
269
270 ## sn 71-73 ##
271
272 TeleBT v0.3 2012.12.19.
273
274 ## sn 74-76 ##
275
276 MegaDongle v0.2 2012.12.27.
277
278 ## sn 77-79 ##
279
280 TeleScience v0.2 2013.01.12.
281
282 ## sn 80-82 ##
283
284 TeleGPS v0.1 2013.03.20
285
286 ## sn 83-85 ##
287
288 TeleMega v0.3 2013.05.07.  sn 85 has cc1125, the others have cc1120.
289
290 ## sn 100-207 ##
291
292 First production run of 108 pieces of TeleDongle v0.2 by 
293 [Advanced Circuits](http://4pcb.com), received 2010.02.25.
294
295 ## sn 208-261 ##
296
297 First production run of 54 pieces of TeleMetrum v1.0 by
298 [Advanced Circuits](http://4pcb.com), received 2010.04.08.
299
300 ## sn 262-366 ##
301
302 Production run of 105 pieces of TeleMetrum v1.1 by
303 [Advanced Circuits](http://4pcb.com), received 2011.01.06.
304
305 ## sn 367-690 ##
306
307 Production run of 324 pieces of TeleDongle v0.2 by 
308 [Advanced Circuits](http://4pcb.com), received 2011.03.21.
309
310 ## sn 691-834 ##
311
312 Production run of 144 pieces of TeleMini v1.0 by
313 [Advanced Circuits](http://4pcb.com), received 2011.07.25.
314
315 ## sn 835-941 ##
316
317 Production run of 107 pieces of TeleMetrum v1.2 by
318 [Advanced Circuits](http://4pcb.com), received 2011.12.15.
319
320 ## sn 942-1049 ##
321
322 Production run of 108 pieces of TeleMetrum v1.2b by
323 [Advanced Circuits](http://4pcb.com), received 2012.10.29.
324
325 ## sn 1050-1169 ##
326