work in progress
[web/altusmetrum] / production.mdwn
1 # Altus Metrum Units Constructed
2
3 This page contains Bdale's notes about each unit of [TeleMetrum](TeleMetrum/) 
4 and [TeleDongle](TeleDongle/) assembled to date.
5
6 ## sn 1 ##
7
8 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
9 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
10 ground.  R17 replaced with short circuit, R18 removed.
11
12 Installed in Bdale's Vertical Assault.  First unit to be flown on 
13 2009.04.19, on a Cesaroni J335.
14
15 Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
16 2009.07.18 with a MAWD as backup.  The first dual-deploy flight with a TM
17 board in control of ejection charges!
18
19 ## sn 2 ##
20
21 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
22 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
23 ground.
24
25 Delivered to Keith Packard for firmware development and use.  Flown twice
26 on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors.
27
28 Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload.  The
29 ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
30 and screw terminal block connectors got more or less torn off, but the rest
31 of the board survived and good data was recovered from the flight.
32
33 Repaired by Bdale, sent back to Keith on 7 July 2009.  Keith reported the
34 baro sensor as flakey, it was replaced in October 2009 prior to 
35 NCR Octoberfest.
36
37 ## sn 3 ##
38
39 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
40 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
41 from each to ground.
42
43 Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never
44 flown there.
45
46 Pulled and given to Keith to take home from Mayhem.
47
48 Lost in Keith's Nike which was lost for a while after an apparently nominal 
49 flight in June 2009 at Brothers, Oregon.  Rocket was later found and this unit
50 is reportedly still in good condition.
51
52 ## sn 4 ##
53
54 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
55 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
56 from each to ground.
57
58 Installed in Robert's Lil Nuke.
59
60 Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
61 both it and the electronics sled came out at apogee and were not recovered.
62
63 ## sn 5 ##
64
65 Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial 
66 connector for use as TeleDongle or for TeleTerra prototype.
67
68 Bdale's TeleDongle.
69
70 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
71
72 ## sn 6 ##
73
74 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
75
76 Keith's TeleDongle.
77
78 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
79
80 ## sn 7 ##
81
82 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
83 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
84 from each to ground.
85
86 Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
87 in October 2009 as replacement.
88
89 ## sn 8 ##
90
91 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
92 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
93 from each to ground.
94
95 Delivered to Keith in early November 2009.
96
97 ## sn 9 ##
98
99 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
100 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
101 from each to ground.
102
103 Installed in Bdale's Trick-o-Treat 98mm airframe.
104
105 ## sn 10 ##
106
107 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
108 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
109 from each to ground.
110
111 Installed in Robert's Lil Nuke.
112
113 ## sn 11 ##
114
115 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
116 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
117 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
118
119 In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
120 Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
121
122 Beeper failed after a hard landing, replaced 2010.02.06.
123
124 ## sn 12 ##
125
126 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
127 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
128 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
129
130 ## sn 13 ##
131
132 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
133 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
134 from each to ground.
135
136 Modified 2009.11.20 to:
137
138 * use TC1055-3.3VCT713 100ma regulator proposed for v0.2
139 * route 3.3V instead of v_lipo to the serial connector for SkyTraq GPS
140 * use v_lipo for pyro voltage instead of 5V with 1000uF capacitor
141 * added 100uF 1206 capacitor on 3.3V rail
142
143 In this configuration, flew two textbook perfect flights on 2009.11.21 at
144 Hudson Ranch in Trick-O-Treat on J motors.
145
146 ## sn 14 ##
147
148 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
149 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
150 from each to ground.
151
152 Modified 2010.10.18:
153
154 * R10 changed to 27k to allow keithp to test use of 1.25V ADC internal 
155   reference with the accelerometer
156
157 Delivered to keithp on 2010.10.19.
158
159 Modifed by keithp on 2011.03.30 to have 3.3V on the serial connector power pin.
160
161 ## sn 15 ##
162
163 Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
164
165 ## sn 16 ##
166
167 Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
168
169 ## sn 17-21 ##
170
171 Full load of TeleMini v0.1 PCBs on 2011.03.07.  Minor variations due to 
172 parts availability, as follows:
173
174 * sn 17-18 have TXC oscillators, sn 19-21 have Abracom
175 * sn 21 is missing the dual LED 
176
177 ## sn 25-26 ##
178
179 Full load of TeleTerra v0.1 PCBs on 2010.10.31
180
181 ## sn 27-31 ##
182
183 Full load of TeleNano v0.1 PCBs on 201103.09.  sn 27 has TXC oscillator, all
184 others have Abracom, no other significant variations.
185
186 ## sn 32-33 ##
187
188 Full load of TeleMini v0.2 PCBs on 2011.05.04.
189
190 ## sn 34-36 ##
191
192 Full load of TeleScience v0.1 PCBs on 2011.05.05.
193
194 ## sn 37-38 ##
195
196 Full load of TeleBT v0.1 PCBs on 2011.05.06.
197
198 ## sn 51 ##
199
200 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 100g accel and screw 
201 terminals.
202
203 Installed in G-Spot on 2010.02.06.
204
205 ## sn 52 ##
206
207 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 50g accel and Tyco header.
208
209 Went home with Keith from LCA 2010 in Wellington.
210
211 ## sn 53 ##
212
213 Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 40g accel and screw 
214 terminals.
215
216 ## sn 54-56 ##
217
218 Prototypes of TeleMetrum v1.1 loaded with the newer Venus 638 chips for 
219 evalutation, loaded as part of the production v1.1 run by 
220 [Advanced Circuits](http://4pcb.com), received 2011.01.06.
221
222 ## sn 100-207 ##
223
224 First production run of 108 pieces of TeleDongle v0.2 by 
225 [Advanced Circuits](http://4pcb.com), received 2010.02.25.
226
227 ## sn 208-261 ##
228
229 First production run of 54 pieces of TeleMetrum v1.0 by
230 [Advanced Circuits](http://4pcb.com), received 2010.04.08.
231
232 ## sn 262-366 ##
233
234 Production run of 105 pieces of TeleMetrum v1.1 by
235 [Advanced Circuits](http://4pcb.com), received 2011.01.06.
236
237 ## sn 367-690 ##
238
239 Production run of 324 pieces of TeleDongle v0.2 by 
240 [Advanced Circuits](http://4pcb.com), received 2011.03.21.
241
242 ## sn 691-834 ##
243