moving datasheets to common repo
[hw/teleterra] / teleterra.pcb
2013-01-06 Bdale Garbeemuch cleaning up of the silk fab-v0.3
2013-01-06 Bdale Garbeemove to current SMA footprint, lots of copper cleanup
2013-01-05 Bdale Garbeeshove the USB connector closer to the edge for maximum...
2013-01-05 Bdale Garbeefix mounting hole connectivity problem
2013-01-05 Bdale Garbeetweaking
2013-01-05 Bdale Garbeegetting closer
2013-01-05 Bdale Garbeeu.fl
2013-01-05 Bdale Garbeeschematic forward annotated, more to do on outline...
2013-01-05 Bdale Garbeeworking on v0.3
2011-09-13 Bdale Garbeeadd Altus Metrum graphic to silk fab-v0.2
2011-09-12 Bdale Garbeechanges due to keithp's design review .. LCD hole diame...
2011-09-12 Bdale Garbeeclean up a vew copper issues, including re-doing a...
2011-09-12 Bdale Garbeeclean up items near plane edges
2011-09-12 Bdale Garbeefix trace min width violations
2011-09-12 Bdale Garbeefix mask clearance on the big GPS antenna pad
2011-09-12 Bdale Garbeefix mask clearance on GPS antenna
2011-09-12 Bdale Garbeefix silk line width on beeper
2011-09-12 Bdale Garbeefix mask clearance on GPS chip
2011-09-12 Bdale Garbeefix mask clearance on SMA
2011-09-12 Bdale Garbeeclean up silk
2011-09-12 Bdale Garbeeadd silkscreen content
2011-09-12 Bdale Garbeeimprove via location cheaper
2011-09-12 Bdale Garbeesignal integrity improvements around GPS chip
2011-09-12 Bdale Garbeefix potential broken trace
2011-09-12 Bdale Garbeelose tiny trace fragment found by DRC
2011-09-12 Bdale Garbeecleaning up perceived DRC issues
2011-09-12 Bdale Garbeeopen up gap between gnd_rf and main gnd planes a bit...
2011-09-11 Bdale Garbeefix problem I always have with cc1111 vias not having...
2011-09-11 Bdale Garbeeadd attribute to cause DRC to skip the outline layer
2011-09-11 Bdale Garbeeclean up and thicken power traces
2011-09-11 Bdale Garbeeroute complete
2011-09-11 Bdale Garbeedown to 4 disconnects
2011-09-11 Bdale Garbeesnapshot before changing shunt component type
2011-09-11 Bdale Garbeelots of layout work at the rink
2011-09-10 Bdale Garbeesnapshot work done so far at rink before messing with...
2011-09-09 Bdale Garbeeworked out gnd_rf area around GPS chip and antenna
2011-09-08 Bdale Garbeesimplify config files, work on GPS antenna footprint
2011-09-08 Bdale Garbeenotch pcb edge for SMA wall
2011-09-08 Bdale Garbeeworking on layout
2011-09-08 Bdale Garbeesnapshot pcb changes
2011-08-13 Bdale Garbeemove the display higher
2011-08-13 Bdale Garbeesnapshot
2011-07-03 Bdale Garbeesignificant work on cost-reduced version .. still worki...
2010-12-20 Bdale Garbeefix AVR ISP header footprint
2010-12-14 Bdale Garbeecatch pcb layout up with schematic changes, declare...
2010-11-18 Bdale Garbeeallow value changes from schematic to flow through...
2010-11-18 Bdale Garbeeupdate to reflect changed footprint name
2010-11-03 Bdale Garbeechange in lipo connector footprint name, DK part number...
2010-10-23 Bdale Garbeeanother mask clearance issue resolved fab-v0.1
2010-10-22 Bdale Garbeemake sure we're up to date on forward annotations
2010-10-22 Bdale Garbeefix AVR footprint name
2010-10-22 Bdale Garbeemore freedfm-inspired cleanup work
2010-10-22 Bdale Garbeemore cleanup issues
2010-10-22 Bdale Garbeefix more clearance issues
2010-10-22 Bdale Garbeepost cleanup
2010-10-22 Bdale Garbeefix DFM issues identified by freedfm.com .. mostly...
2010-10-21 Bdale Garbeeflow attribute changes through to pcb file
2010-10-21 Bdale Garbeeadd two more bypass caps, one near GPS chip, one near...
2010-10-21 Bdale Garbeeground plane constrained within board outline at corner...
2010-10-21 Bdale Garbeesignificant improvements in bottom side ground plane...
2010-10-21 Bdale Garbeeadd partially-populated companion connector so we can...
2010-10-21 Bdale Garbeelose the LED on the cc1111, and put test points on...
2010-10-21 Bdale Garbeemove sw_center off pc7 in case we decide that we need...
2010-10-21 Bdale Garbeeadd trace to connect LCD R/W line at Keith's request
2010-10-20 Bdale Garbeeno disconnects, and no DRC errors
2010-10-20 Bdale Garbeefix via annular ring dimension
2010-10-20 Bdale Garbeefix element silk minimum dimensions, matching changes...
2010-10-20 Bdale Garbeemore DRC fixes
2010-10-20 Bdale Garbeemore DRC fixes
2010-10-20 Bdale Garbeemoved R4 and R5 over near the regulators
2010-10-20 Bdale Garbeefixed a number of DRC issues .. more to go
2010-10-20 Bdale Garbeeonly pin 1 of the ALPS switch footprint should be square
2010-10-20 Bdale Garbeecleaning up some traces
2010-10-20 Bdale Garbeeclean up v_usb trace, etc
2010-10-20 Bdale Garbeefully routed .. but not pretty!
2010-10-20 Bdale Garbeemuch more pcb work
2010-10-19 Bdale Garbeeboard size adjusted so SMA fits inside box, USB as...
2010-10-19 Bdale Garbeemoved parts around .. pcb still over-long .. 4862 is...
2010-10-19 Bdale Garbeereduced size of LCD pads, more traces added
2010-10-15 Bdale Garbeecontinuing to work on layout
2010-10-14 Bdale Garbeesignificant progress during EWR->DEN flight
2010-10-14 Bdale Garbeeclean up outline layer
2010-10-14 Bdale Garbeesnapshot before bounding plane corners
2010-10-14 Bdale Garbeeground plane successfully split
2010-10-14 Bdale Garbeesnapshot before splitting gnd plane under GPS chip
2010-10-07 Bdale Garbeesnapshot .. about 100 disconnects left origin/audio
2010-08-27 Bdale Garbeemore work on pcb
2010-08-27 Bdale Garbeesnapshot after some footprint changes
2010-08-26 Bdale Garbeeupdate pcb to reflect new switch footprint, etc
2010-08-13 Bdale Garbeereplace LCD footprint with one that isn't being integer...
2010-08-13 Bdale Garbeepondering component placements
2010-08-13 Bdale Garbeerotated, all existing trace routing erased
2010-08-12 Bdale Garbeeboard outline complete for Hammond 1559B box
2010-08-12 Bdale Garbeesnapshot
2010-06-25 Bdale Garbeegetting closer to having the right footprints included
2010-06-21 Bdale Garbeestarting pcb layout .. board size and mounting holes...