fire.
### Journal ###
+* 2013 November 25<br>Met with contractor and architect to deliver our
+ proposed updates to the plan and discuss. We're actually happier
+ with the revised design, they both seem to like what we proposed,
+ and everyone is optimistic it will come in within budget.
+* 2013 November 18<br>Met with our contractor to discuss costs. Not too
+ surprisingly in hindsight, what we designed would cost more to build
+ than we are prepared to spend. Back to the drawing board, literally!
+* 2013 November 2<br>Met with our contractor to provide information he needs
+ to put cost estimates together for us in parallel with waiting for
+ structural engineering work to be completed.
* 2013 October 21<br>After several iterations, we now have floor plans and
elevations that accurately represent what we'd like to build.
* 2013 September 19<br>First draft of main floor plan received from the