X-Git-Url: https://git.gag.com/?p=web%2Fgag.com;a=blobdiff_plain;f=index.mdwn;h=13975383816960311a0b91bd447e1c406078aa57;hp=1c683792b189bbbd62113334c825d9972cf71940;hb=9f0c83b8595dc714ec0e5301febfba25a43b5540;hpb=f766174d9354042bb8d625674891eeb55d2f57f3 diff --git a/index.mdwn b/index.mdwn index 1c68379..1397538 100644 --- a/index.mdwn +++ b/index.mdwn @@ -51,6 +51,16 @@ were directly fighting the fire on and around our property: fire. ### Journal ### +* 2013 November 25
Met with contractor and architect to deliver our + proposed updates to the plan and discuss. We're actually happier + with the revised design, they both seem to like what we proposed, + and everyone is optimistic it will come in within budget. +* 2013 November 18
Met with our contractor to discuss costs. Not too + surprisingly in hindsight, what we designed would cost more to build + than we are prepared to spend. Back to the drawing board, literally! +* 2013 November 2
Met with our contractor to provide information he needs + to put cost estimates together for us in parallel with waiting for + structural engineering work to be completed. * 2013 October 21
After several iterations, we now have floor plans and elevations that accurately represent what we'd like to build. * 2013 September 19
First draft of main floor plan received from the