updating for better web publishing
[web/gag.com] / rockets / projects / yikstik / images / morepix
diff --git a/rockets/projects/yikstik/images/morepix b/rockets/projects/yikstik/images/morepix
deleted file mode 100644 (file)
index ddc3c51..0000000
+++ /dev/null
@@ -1,67 +0,0 @@
-r717
-
-2845   fins in vacuum bagging
-2849   fins just out of vacuum bagging
-2856   3 fins with excess CF roughly trimmed away on bench
-2868   fit testing ebay bulkhead
-2877   milling machine cutting centering ring with fin slots
-2886   finished ring after light sanding
-2888   fit testing fin-can ring
-2891   set-up for sanding rings on lathe
-2895   stack of rings for fin can, shows smaller one for zipperless coupler
-2896   same stack skewed to show thicknesses
-2899   installing inserts for rail buttons in fin can rings
-2901   inserts after grinding flush with ring surface
-2911   detail showing aircraft cable swage and JB Weld attachment
-2913   detail showing how fins fit in to centering ring slots
-2915   fin can with 2 rings glued, aircraft cable, fins dry-fit
-2916   nose cone after cutting aft end off
-2917   view into payload bay after coupler epoxied in
-2920   payload bay and nose cone dry-fit testing
-2922   one end of ebay showing wing nuts and u-bolt installed
-2923   detail showing ebay bulkhead stepped milling, u-bolt hardware
-2950   detail showing replacement of fin forward ring to allow use of tailcone
-2954   dry fit of aft ring and tailcone
-2960   dry fit of fins, aft ring, tailcone
-2961   test fit of fin alignment jig
-2964   detail showing fins epoxied to MMT, no glue on aft ring yet
-2965   detail showing fins epoxied to MMT at forward ring end
-2978   waiting for epoxy to cure with fin jig on
-2983   dry fit of tailcone, adapters, J285 after epoxy set but while curing
-2988   masked for first set of fin to MMT reinforcement
-2990   detail of aft end with glass across MMT and in fin joints
-2991   detail of forward end with glass across MMT and in fin joints
-2992   bags of water holding glass in place during curing
-2994   overall view of fin to fin reinforcement one side
-3000   closeup of fin surfaces dremel-sanded before reinforcement installation
-3009   marking airframe for fin slots
-3012   dry fit of airframe after fin slotting
-3015   closeup of aft end of airframe tube; fin slots and rail button hole
-3016   rail button insert loaded with grease for airframe installation
-3019   fin fronts taped to retain epoxy
-3022   close up of aft end of airframe with rubber bands during epoxy pour
-3026   close up of aft end showing interior during first epoxy pour
-3035   taped and ready for first pair of interior fin to airframe fillets
-3040   wiring of avionics power and safe/arm switches
-3042   view of interior fin fillet, west systems with milled glass
-3046   epoxy pour at front end of zipperless assembly
-3048   taping to retain epoxy during pour associated with aft ring install
-3052   aft ring installed, west systems poured and JB weld on MMT for tailcone
-3054   tail cone fitted and epoxies curing
-
-m537r
-
-0754   interior of avionics bay showing switches and rail button block
-0755   payload bay sled support ring
-0756   avionics bay switches from outside, lousy job making holes in airframe
-0758   much better job done for switch on payload bay
-0763   assembling avionics and payload bay sleds
-0770   6-32 inserts in sled support rings for avionics bay
-0772   interior of avionics bay with sled support rings installed
-0783   aft of payload bay after epoxy pour
-0784   payload bay with sled installed for fit check
-0785   screw retaining ring in nose cone
-0791   avionics bay bulkhead ready to fly with charge holders, etc
-0795   avionics sled with altimeters and 9V batteries installed
-
-