volume inside the nose cone to hold my choice of "laundry", a "traditional"
dual deploy setup with two pyro initiated separation events became plan A.
+The airframe geometry should easily support a 4-grain 98mm motor, which can
+be a "full M", so this should be a fun airframe to make research motors for!
+
## Design / Simulation File
## Construction Log
Designed and machined replacement aft ring, located the unused 98mm Aeropack
retainer already on hand.
+2021.02.23
+Installed aft ring with 5-minute epoxy.
+
## Photos
## Flight Log