admit to new role at HP
[web/gag.com] / blackforestfire.mdwn
index 5c5d35ea6ea6c039d0223bb1861974366c7ba430..6623d37752a81f3617bdb3180d0e69b531f27836 100644 (file)
@@ -14,6 +14,11 @@ survived.  So we quickly decided to re-build on the same property, and hope
 the new house will be ready by late summer 2014.  In the meantime, we're 
 living in an apartment in nearby Colorado Springs.
 
 the new house will be ready by late summer 2014.  In the meantime, we're 
 living in an apartment in nearby Colorado Springs.
 
+If you want to hear more about our experience, feel free to view the video 
+of Bdale's 
+[talk at Linux Conf Australia](https://www.youtube.com/watch?v=lJcnllq3VYY)
+about the fire and some of the lessons we learned.
+
 ###Helping###
 
 For those of you who have asked how you can help us restore and rebuild, 
 ###Helping###
 
 For those of you who have asked how you can help us restore and rebuild, 
@@ -48,6 +53,13 @@ were directly fighting the fire on and around our property:
 
 ### Journal ###
 
 
 ### Journal ###
 
+* 2014 July 31<br>Hardwood floors are in, tile floors are in process, finish
+       electrical has started, trim material in the process of being stained.
+* 2014 June 10<br>Rough-in inspections for plumbing, electrical, HVAC, and
+       so forth all completed... on to insulation!
+* 2014.May 8<br>Exterior doors and windows in, roofing begun, 
+       duct work underway.
+* 2014.April 26<br>Concrete slabs for basement and garage floor poured.
 * 2014 April 9<br>Roof trusses installed.
 * 2014 March 25<br>Framing started.
 * 2014 March 14<br>Concrete poured for the foundation / basement walls.
 * 2014 April 9<br>Roof trusses installed.
 * 2014 March 25<br>Framing started.
 * 2014 March 14<br>Concrete poured for the foundation / basement walls.