projects
/
web
/
altusmetrum
/ commitdiff
commit
grep
author
committer
pickaxe
?
search:
re
summary
|
shortlog
|
log
|
commit
| commitdiff |
tree
raw
|
patch
|
inline
| side by side (parent:
a85aaef
)
be a little more honest about TeleLaunch futures
author
Bdale Garbee
<bdale@gag.com>
Wed, 29 Jul 2020 02:13:15 +0000
(20:13 -0600)
committer
Bdale Garbee
<bdale@gag.com>
Wed, 29 Jul 2020 02:13:15 +0000
(20:13 -0600)
TeleLaunch/futures.mdwn
patch
|
blob
|
history
diff --git
a/TeleLaunch/futures.mdwn
b/TeleLaunch/futures.mdwn
index 3a4a82c5bb03d7ba7df43ede2a1ed5d7255ef3f6..cc6526e2536c512db763fec6e212074d9f5aa5ad 100644
(file)
--- a/
TeleLaunch/futures.mdwn
+++ b/
TeleLaunch/futures.mdwn
@@
-4,7
+4,7
@@
The products on this page are shown in prototype form. They are "not ready
for prime time" yet, but we're including documentation about them because
The products on this page are shown in prototype form. They are "not ready
for prime time" yet, but we're including documentation about them because
-we're fairly confident they'll be added to the product line
this year.
+we're fairly confident they'll be added to the product line
someday.
Please note that features and specifications are highly likely to change
before release.
Please note that features and specifications are highly likely to change
before release.
@@
-54,6
+54,6
@@
The TeleFireOne hardware design is available from
## Availability ##
Prototypes of these products have been built, deployed, and used
## Availability ##
Prototypes of these products have been built, deployed, and used
-successfully. Updates to the designs are underway
and we hope to
-
introduce them sometime in 2019
.
+successfully. Updates to the designs are underway
, with at least
+
one more prototype round likely before we commit to production
.