## sn 51 ##
-Full load of v0.2 PCB on 2010.01.09, with 100g accel and screw terminals.
+Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 100g accel and screw
+terminals.
Installed in G-Spot on 2010.02.06.
## sn 52 ##
-Full load of v0.2 PCB on 2010.01.09, with 50g accel and Tyco header.
+Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 50g accel and Tyco header.
Went home with Keith from LCA 2010 in Wellington.
## sn 53 ##
-Full load of v0.2 PCB on 2010.01.09, with 40g accel and screw terminals.
+Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 40g accel and screw
+terminals.
## sn 100-207 ##