Merge branch 'master' of ssh://git.gag.com/scm/git/web/altusmetrum
[web/altusmetrum] / TeleMetrum / production.mdwn
index c8b3073a9cef0c3f6a389f3cfe4c1babd5b68786..964f4eb41256bb432a3d797ca980f62903aab1a4 100644 (file)
@@ -10,7 +10,11 @@ chip select, R14 and R15 loaded with 56k, 10k tacked from each to
 ground.  R17 replaced with short circuit, R18 removed.
 
 Installed in Bdale's Vertical Assault.  First unit to be flown on 
-19 April 2009, on a Cesaroni J335.
+2009.04.19, on a Cesaroni J335.
+
+Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
+2009.07.18 with a MAWD as backup.  The first dual-deploy flight with a TM
+board in control of ejection charges!
 
 ## sn 2 ##
 
@@ -26,7 +30,9 @@ ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
 and screw terminal block connectors got more or less torn off, but the rest
 of the board survived and good data was recovered from the flight.
 
-Repaired by Bdale, sent back to Keith on 7 July 2009.
+Repaired by Bdale, sent back to Keith on 7 July 2009.  Keith reported the
+baro sensor as flakey, it was replaced in October 2009 prior to 
+NCR Octoberfest.
 
 ## sn 3 ##
 
@@ -39,7 +45,9 @@ flown there.
 
 Pulled and given to Keith to take home from Mayhem.
 
-Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not recovered.
+Lost in Keith's Nike which was lost for a while after an apparently nominal 
+flight in June 2009 at Brothers, Oregon.  Rocket was later found and this unit
+is reportedly still in good condition.
 
 ## sn 4 ##
 
@@ -49,6 +57,9 @@ from each to ground.
 
 Installed in Robert's Lil Nuke.
 
+Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
+both it and the electronics sled came out at apogee and were not recovered.
+
 ## sn 5 ##
 
 Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial 
@@ -56,8 +67,103 @@ connector for use as TeleDongle or for TeleTerra prototype.
 
 Bdale's TeleDongle.
 
+Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
+
 ## sn 6 ##
 
 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
 
-Delivered to Keith Packard for firmware development and use.
+Keith's TeleDongle.
+
+Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
+
+## sn 7 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
+in October 2009 as replacement.
+
+## sn 8 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+Delivered to Keith in early November 2009.
+
+## sn 9 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+Installed in Bdale's Trick-o-Treat 98mm airframe.
+
+## sn 10 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+Installed in Robert's Lil Nuke.
+
+## sn 11 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
+
+In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
+Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
+
+## sn 12 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
+
+## sn 13 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+Modified 2009.11.20 to:
+
+* use TC1055-3.3VCT713 100ma regulator proposed for v0.2
+* route 3.3V instead of v_lipo to the serial connector for SkyTraq GPS
+* use v_lipo for pyro voltage instead of 5V with 1000uF capacitor
+* added 100uF 1206 capacitor on 3.3V rail
+
+In this configuration, flew two textbook perfect flights on 2009.11.21 at
+Hudson Ranch in Trick-O-Treat on J motors.
+
+## sn 14 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+## sn 15 ##
+
+Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
+
+## sn 16 ##
+
+Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
+
+## sn 51 ##
+
+Full load of v0.2 PCB on 2010.01.09, with 100g accel and Tyco header.
+
+## sn 52 ##
+
+Full load of v0.2 PCB on 2010.01.09, with 50g accel and Tyco header.
+
+## sn 53 ##
+
+Full load of v0.2 PCB on 2010.01.09, with 40g accel and screw terminals.
+