Installed in Bdale's Vertical Assault. First unit to be flown on
19 April 2009, on a Cesaroni J335.
-Moved to Horizon rebuild.
+Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
+2009.07.18 with a MAWD as backup. The first dual-deploy flight with a TM
+board in control of ejection charges!
## sn 2 ##
and screw terminal block connectors got more or less torn off, but the rest
of the board survived and good data was recovered from the flight.
-In Bdale's possession for repair.
+Repaired by Bdale, sent back to Keith on 7 July 2009. Keith reports the
+baro sensor (which is still original) is flakey and needs to be replaced.
## sn 3 ##
Pulled and given to Keith to take home from Mayhem.
+Lost in Keith's Nike which was never found after an apparently nominal flight
+in June 2009 at Brothers, Oregon.
+
## sn 4 ##
Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2
Installed in Robert's Lil Nuke.
+Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
+both it and the electronics sled came out at apogee and were not recovered.
+
## sn 5 ##
Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial
connector for use as TeleDongle or for TeleTerra prototype.
+Bdale's TeleDongle.
+
+Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
+
## sn 6 ##
Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
-Delivered to Keith Packard for firmware development and use.
+Keith's TeleDongle.
+
+Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
+
+## sn 7 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
+in October 2009 as replacement.
+
+## sn 8 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+Delivered to Keith in early November 2009.
+
+## sn 9 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+Installed in Bdale's Trick-o-Treat 98mm airframe.
+
+## sn 10 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+Installed in Robert's Lil Nuke.
+
+## sn 11 ##
+
+Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground. Accelerometer loaded is MMA2204EG 100G unit!
+
+In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
+Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
+
+## sn 12 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground. Accelerometer loaded is MMA2204EG 100G unit!
+
+## sn 13 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+## sn 14 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+## sn 15 ##
+
+Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
+
+## sn 16 ##
+
+Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
+