## Future Plans ##
-TeleMega v0.1 prototypes are working and flight testing is underway. This
-version was shown publicly at NARCON 2013.
+TeleMega v0.1 prototypes worked and were flown on a number of test
+flights. This version was shown publicly at NARCON 2013.
Several changes to the hardware to improve performance and reliability
resulted in a v0.2 prototype version, however feedback from conversations at
NARCON caused us to sort of "skip" doing much with this version.
-As of early May 2013, we're in the midst of building and testing v0.3
-prototypes with an improved pyro control circuit and u-blox GPS
-receiver.
+Version 0.3 prototypes are built and working, with an improved pyro control
+circuit and u-blox GPS receiver.
-We hope to introduce this product sometime in July, 2013, if all goes well.
+The first test flight of v0.3 was on 19 May 2013, and the results look
+great! We plan more tests at [NSL 2013](http://nsl2013.org), and if all
+continues to go well, we hope to introduce this product in July, 2013.