add MegaMetrum page, tweak various other pages wrt schedule predictions
[web/altusmetrum] / TeleBT / index.mdwn
index b4bf82bae5ff5eb11883e05e4cc151703fcf4922..5ae0a63b366aba341ce00f143f27f6b427dbf9b1 100644 (file)
@@ -67,4 +67,9 @@ Two prototype versions have been built with different physical form factors.
 We have working firmware, and a prototype of support in AltosUI.  Work is
 also underway on an [Android](http://www.android.com) version of AltosUI.  
 
-No firm schedule for production and sale of TeleBT has been set yet.
+Prototype version 0.3 is underway, resolving mechanical fit issues in the box
+we've chosen and updating the circuit to use our now-preferred LiPo charger
+chip.  We hope this version will be one we're willing to put in to production.
+
+No firm schedule for production and sale of TeleBT has been set yet, but we
+hope to have this product in product before the end of 2012.