document another build session
[web/altusmetrum] / TeleMetrum / production.mdwn
1 # TeleMetrum Units
2
3 This page contains Bdale's notes about each unit of [TeleMetrum](..) 
4 assembled to date.
5
6 ## sn 1 ##
7
8 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
9 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
10 ground.  R17 replaced with short circuit, R18 removed.
11
12 Installed in Bdale's Vertical Assault.  First unit to be flown on 
13 19 April 2009, on a Cesaroni J335.
14
15 Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
16 2009.07.18 with a MAWD as backup.  The first dual-deploy flight with a TM
17 board in control of ejection charges!
18
19 ## sn 2 ##
20
21 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
22 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
23 ground.
24
25 Delivered to Keith Packard for firmware development and use.  Flown twice
26 on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors.
27
28 Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload.  The
29 ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
30 and screw terminal block connectors got more or less torn off, but the rest
31 of the board survived and good data was recovered from the flight.
32
33 Repaired by Bdale, sent back to Keith on 7 July 2009.  Keith reports the
34 baro sensor (which is still original) is flakey and needs to be replaced.
35
36 ## sn 3 ##
37
38 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
39 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
40 from each to ground.
41
42 Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never
43 flown there.
44
45 Pulled and given to Keith to take home from Mayhem.
46
47 Lost in Keith's Nike which was never found after an apparently nominal flight 
48 in June 2009 at Brothers, Oregon.
49
50 ## sn 4 ##
51
52 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
53 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
54 from each to ground.
55
56 Installed in Robert's Lil Nuke.
57
58 Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
59 both it and the electronics sled came out at apogee and were not recovered.
60
61 ## sn 5 ##
62
63 Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial 
64 connector for use as TeleDongle or for TeleTerra prototype.
65
66 Bdale's TeleDongle.
67
68 ## sn 6 ##
69
70 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
71
72 Keith's TeleDongle.
73
74 Keith added acrylic LED light pipes and a LiPo for use in RDF after flgith.
75
76 ## sn 7 ##
77
78 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
79 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
80 from each to ground.
81
82 ## sn 8 ##
83
84 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
85 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
86 from each to ground.
87
88 ## sn 9 ##
89
90 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
91 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
92 from each to ground.
93
94 ## sn 10 ##
95
96 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
97 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
98 from each to ground.
99
100 ## sn 11 ##
101
102 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
103 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
104 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
105