1 # TeleMetrum Units
2
3 This page contains Bdale's notes about each unit of [TeleMetrum](..) 
4 assembled to date.
5
6 ## sn 1 ##
7
8 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
9 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
10 ground.  R17 replaced with short circuit, R18 removed.
11
12 Installed in Bdale's Vertical Assault.  First unit to be flown on 
13 19 April 2009, on a Cesaroni J335.
14
15 Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
16 2009.07.18 with a MAWD as backup.  The first dual-deploy flight with a TM
17 board in control of ejection charges!
18
19 ## sn 2 ##
20
21 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
22 chip select, R14 and R15 loaded with 56k, 10k tacked from each to 
23 ground.
24
25 Delivered to Keith Packard for firmware development and use.  Flown twice
26 on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors.
27
28 Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload.  The
29 ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
30 and screw terminal block connectors got more or less torn off, but the rest
31 of the board survived and good data was recovered from the flight.
32
33 Repaired by Bdale, sent back to Keith on 7 July 2009.  Keith reports the
34 baro sensor (which is still original) is flakey and needs to be replaced.
35
36 ## sn 3 ##
37
38 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
39 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
40 from each to ground.
41
42 Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never
43 flown there.
44
45 Pulled and given to Keith to take home from Mayhem.
46
47 Lost in Keith's Nike which was never found after an apparently nominal flight 
48 in June 2009 at Brothers, Oregon.
49
50 ## sn 4 ##
51
52 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
53 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
54 from each to ground.
55
56 Installed in Robert's Lil Nuke.
57
58 Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
59 both it and the electronics sled came out at apogee and were not recovered.
60
61 ## sn 5 ##
62
63 Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial 
64 connector for use as TeleDongle or for TeleTerra prototype.
65
66 Bdale's TeleDongle.
67
68 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
69
70 ## sn 6 ##
71
72 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
73
74 Keith's TeleDongle.
75
76 Keith added acrylic LED light pipes and a LiPo for use in RDF after flight.
77
78 ## sn 7 ##
79
80 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
81 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
82 from each to ground.
83
84 Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
85 in October 2009 as replacement.
86
87 ## sn 8 ##
88
89 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
90 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
91 from each to ground.
92
93 Delivered to Keith in early November 2009.
94
95 ## sn 9 ##
96
97 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
98 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
99 from each to ground.
100
101 Installed in Bdale's Trick-o-Treat 98mm airframe.
102
103 ## sn 10 ##
104
105 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
106 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
107 from each to ground.
108
109 Installed in Robert's Lil Nuke.
110
111 ## sn 11 ##
112
113 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
114 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
115 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
116
117 In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
118 Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
119
120 ## sn 12 ##
121
122 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
123 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
124 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
125
126 ## sn 13 ##
127
128 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
129 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
130 from each to ground.
131
132 Modified 2009.11.20 to:
133
134 * use TC1055-3.3VCT713 100ma regulator proposed for v0.2
135
136 ## sn 14 ##
137
138 Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
139 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
140 from each to ground.
141
142 ## sn 15 ##
143
144 Partial "ground" load of v0.1 PCB on 2009.11.18 for use as TeleDongle.
145
146 ## sn 16 ##
147