3 Robert's first full-custom rocket, with electronic-deployment.
7 Robert had wanted to try out electronic deployment for a while. After he
8 received a [PerfectFlite](http://www.perfectflite.com/)
9 [MAWD](http://www.perfectflite.com/catalog/MAWD.html) commercial recording
10 altimeter with dual deployment support as a Christmas gift, he designed
11 this rocket to make use of it.
15 * 54mm phenolic air frame
16 * 29mm phenolic motor mount
17 * [Giant Leap](http://giantleaprocketry.com/) Pinnacle 54mm nose cone
18 * 1/8 inch birch plywood fins in a custom shape, with rounded edges
19 * 1/4 inch birch plywood centering rings and bulkheads, CNC milled, the two
20 that hold the fins are notched for perfect fin alignment.
24 Construction began the weekend of 11-13 September 2009.
28 First flown at NCR's Oktoberfest 2009.