Update quantities to TF 20/50/100
[hw/telefirefour] / rfq
diff --git a/rfq b/rfq
index 343ac11d0c875a491246cd87006d25af1dc7043a..d3673b922bfa17fa535f660459a1ca82b1fe741d 100644 (file)
--- a/rfq
+++ b/rfq
@@ -1,25 +1,26 @@
 Hi Laura, Kim,
 
-This is a request for quote on raw boards and partial turnkey assembly of
-TeleFire 1.0 and TeleLCO 1.0. We're planning on running this pair of
-products through 'kickstarter', which means we would set a minimum order
-size, but the order could end up larger than that. I think we'll need to
-have quotes for 10, 25, 50 of each board to help set the pricing in
-the campaign.
-
-Kim, like some of our other products, this one has a notch in one side to 
-allow a micro USB connector to overhang the board edge.  As a result, these
-need to be tab-routed.  We have no discussed optimal panelization for a board
-of this geometry before, so please let me know what a good arrangement would
-be if we want to build these in lots of 100'ish.  My latest FreeDFM run 
-resulted in quote 3956159. We'll want to run these in standard spec with
-the cheapest option which I think is 5 days.
+This is a request for quote on raw boards and partial turnkey assembly
+of two new products, TeleLCO 1.0 and TeleFire 1.0. We're planning on
+running these through 'kickstarter', so we'll set a minimum build
+quantity, but the order could end up larger than that. We'd like to
+get quotes for 10, 25, 50 for TeleLCO and 20, 50, 100 TeleFire to help
+set the pricing in the campaign
+
+Kim, like some of our other products, this one has a notch in one side
+to allow a micro USB connector to overhang the board edge.  As a
+result, these need to be tab-routed.  We have no discussed optimal
+panelization for a board of this geometry before, so please let me
+know what a good arrangement would be if we want to build these in
+lots of 10 ish.  My latest FreeDFM run resulted in quotes 3956156 for
+TeleLCO and 3956159 for TeleFire. We'll want to run these in standard
+spec with the cheapest option which I think is 5 days.
 
 Laura, the new BOM is attached, and the XYRS data is in the
-telefire.xy and telelco.xy files in the zips.  As usual will provide
-some hard to find parts and want you to turnkey the rest.  We're quite
-cost sensitive for these, so whatever the cheapest assembly turn
-should be fine.
+telefire.xy and telelco.xy files in the zips.  As usual we will
+provide some hard to find parts and want you to turnkey the rest.
+We're quite cost sensitive for these, so whatever the cheapest
+assembly turn should be fine.
 
 From the standard data request for assembly quotes:
 
@@ -31,16 +32,17 @@ From the standard data request for assembly quotes:
 
      Part Number:               TeleFire and TeleLCO
 
-     Revision:                  both 1.0
+     Revision:                  1.0
 
-     How many to assemble:      10, 25 or 50
+     How many to assemble:      10, 25 or 50 TeleLCO
+                               20, 50 or 100 TeleFire
 
-     PCB dimensions:            TeleFire is 4.00 x 4.00.
-                               TeleLCO is 4.50  x 3.75
+     PCB dimensions:           TeleLCO is 4.50  x 3.75
+                               TeleFire is 4.00 x 4.00.
 
      How parts acquired:        partial turnkey
 
-                                 I will provide J3 for TeleFire and
+                                 We will provide J3 for TeleFire and
                                  J5 for TeleLCO
 
      Parts both sides?:         no