From 3f78a72343abef7db8d0fbd7bc6f893338308d2f Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Thu, 19 Nov 2009 16:26:44 -0700 Subject: [PATCH] syntax again --- bdale/blog/posts/TeleMetrum_Progress.mdwn | 24 +++++++++++------------ 1 file changed, 12 insertions(+), 12 deletions(-) diff --git a/bdale/blog/posts/TeleMetrum_Progress.mdwn b/bdale/blog/posts/TeleMetrum_Progress.mdwn index f313fb5..da6fd8a 100644 --- a/bdale/blog/posts/TeleMetrum_Progress.mdwn +++ b/bdale/blog/posts/TeleMetrum_Progress.mdwn @@ -21,22 +21,22 @@ We're now hard at work on a "next version" of the hardware, incorporating everything we've learned so far. There are a number of significant changes planned: - * Fully integrated, on-board GPS receiver and patch antenna, with - support for off-board amplified antennas when airframe geometry - or materials demand it. +* Fully integrated, on-board GPS receiver and patch antenna, with + support for off-board amplified antennas when airframe geometry + or materials demand it. - * A change in the design of the circuit for firing e-matches to - ignite ejection charges that will improve mechanical reliability, - plus explicit support for using a separate pyro battery if desired. +* A change in the design of the circuit for firing e-matches to + ignite ejection charges that will improve mechanical reliability, + plus explicit support for using a separate pyro battery if desired. - * Inclusion of a "companion board interface" that we envision using - for a pyro channel expansion board to support staging and air - starts, among other things. +* Inclusion of a "companion board interface" that we envision using + for a pyro channel expansion board to support staging and air + starts, among other things. - * Dramatic increase in the capacity of the on-board data logging memory. +* Dramatic increase in the capacity of the on-board data logging memory. - * Changes in connector series to eliminate our dependency on expensive - crimping tools for making cables. +* Changes in connector series to eliminate our dependency on expensive + crimping tools for making cables. To make all this fit, I'm stretching the board an extra 1/4 inch to a total outline of 1 by 2.75 inches. We're also moving all the connectors, the GPS -- 2.30.2