From 1e6be95a5182519cc0eb2b2ee20ca02d0837d8c9 Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Thu, 19 Nov 2009 16:25:02 -0700 Subject: [PATCH] syntax? --- bdale/blog/posts/TeleMetrum_Progress.mdwn | 10 +++++----- 1 file changed, 5 insertions(+), 5 deletions(-) diff --git a/bdale/blog/posts/TeleMetrum_Progress.mdwn b/bdale/blog/posts/TeleMetrum_Progress.mdwn index 59a6437..f313fb5 100644 --- a/bdale/blog/posts/TeleMetrum_Progress.mdwn +++ b/bdale/blog/posts/TeleMetrum_Progress.mdwn @@ -21,21 +21,21 @@ We're now hard at work on a "next version" of the hardware, incorporating everything we've learned so far. There are a number of significant changes planned: - Fully integrated, on-board GPS receiver and patch antenna, with + * Fully integrated, on-board GPS receiver and patch antenna, with support for off-board amplified antennas when airframe geometry or materials demand it. - A change in the design of the circuit for firing e-matches to + * A change in the design of the circuit for firing e-matches to ignite ejection charges that will improve mechanical reliability, plus explicit support for using a separate pyro battery if desired. - Inclusion of a "companion board interface" that we envision using + * Inclusion of a "companion board interface" that we envision using for a pyro channel expansion board to support staging and air starts, among other things. - Dramatic increase in the capacity of the on-board data logging memory. + * Dramatic increase in the capacity of the on-board data logging memory. - Changes in connector series to eliminate our dependency on expensive + * Changes in connector series to eliminate our dependency on expensive crimping tools for making cables. To make all this fit, I'm stretching the board an extra 1/4 inch to a total -- 2.30.2