From 0a2358560d6e14572f5dca3b01249c343469a2cf Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Mon, 22 Oct 2018 16:55:28 -0600 Subject: [PATCH] markdown confused me, sometimes .. maybe I need explicit paragraph tags? --- rockets/airframes/MehGaNuke/index.mdwn | 9 ++------- 1 file changed, 2 insertions(+), 7 deletions(-) diff --git a/rockets/airframes/MehGaNuke/index.mdwn b/rockets/airframes/MehGaNuke/index.mdwn index d79cb38..a98220b 100644 --- a/rockets/airframes/MehGaNuke/index.mdwn +++ b/rockets/airframes/MehGaNuke/index.mdwn @@ -183,16 +183,11 @@ deployment bag was not recovered. After studying the zipper and thinking about the main deployment sequence, several changes will be made before the next flight: - - The main airframe tube will be replaced with a tube that's a bit - longer (for greater stability), and has an internal 7.5-8" diameter - tube instead of the flat baffle to ease main chute deployment. + - The main airframe tube will be replaced with a tube that's a bit longer (for greater stability), and has an internal 7.5-8" diameter tube instead of the flat baffle to ease main chute deployment. - Switch from the ARRD to the largest [Tender Descender](http://www.tinderrocketry.com/l13-tender-descender-tether) for main deployment - - Add a TeleGPS to the nose assembly so it can be tracked - independently, and let it come down under the 2 existing 5-foot - chutes. Add a third 5-foot chute to be a dedicated pilot for the - 28-foot main chute. + - Add a TeleGPS to the nose assembly so it can be tracked independently, and let it come down under the 2 existing 5-foot chutes. Add a third 5-foot chute to be a dedicated pilot for the 28-foot main chute. These changes should reduce the chance of another zipper, and reduce the amount of strap we need to stuff into the bay. -- 2.30.2