more journal entries
authorBdale Garbee <bdale@gag.com>
Sun, 1 Dec 2013 00:19:15 +0000 (17:19 -0700)
committerBdale Garbee <bdale@gag.com>
Sun, 1 Dec 2013 00:19:15 +0000 (17:19 -0700)
index.mdwn

index c535bfee71db4ef9b9fd69b098c318e52382f557..13975383816960311a0b91bd447e1c406078aa57 100644 (file)
@@ -51,8 +51,16 @@ were directly fighting the fire on and around our property:
        fire.
 
 ### Journal ###
+* 2013 November 25<br>Met with contractor and architect to deliver our
+       proposed updates to the plan and discuss.  We're actually happier 
+       with the revised design, they both seem to like what we proposed,
+       and everyone is optimistic it will come in within budget.
+* 2013 November 18<br>Met with our contractor to discuss costs.  Not too
+       surprisingly in hindsight, what we designed would cost more to build
+       than we are prepared to spend.  Back to the drawing board, literally!
 * 2013 November 2<br>Met with our contractor to provide information he needs
-       to put cost estimates together for us.
+       to put cost estimates together for us in parallel with waiting for 
+       structural engineering work to be completed.
 * 2013 October 21<br>After several iterations, we now have floor plans and 
        elevations that accurately represent what we'd like to build.
 * 2013 September 19<br>First draft of main floor plan received from the