big day!
authorBdale Garbee <bdale@gag.com>
Tue, 27 Apr 2010 08:59:06 +0000 (02:59 -0600)
committerBdale Garbee <bdale@gag.com>
Tue, 27 Apr 2010 08:59:06 +0000 (02:59 -0600)
bdale/blog/posts/TeleMetrum_in_Stock.mdwn [new file with mode: 0644]
rockets/airframes/RG-2/index.mdwn

diff --git a/bdale/blog/posts/TeleMetrum_in_Stock.mdwn b/bdale/blog/posts/TeleMetrum_in_Stock.mdwn
new file mode 100644 (file)
index 0000000..015e25d
--- /dev/null
@@ -0,0 +1,21 @@
+[[!tag tags/rockets]]
+[[!tag tags/hamradio]]
+First, I was pleasantly surprised to discover that 
+[TeleMetrum](http://altusmetrum.org/TeleMetrum) is now the subject
+of a post on the [Make magazine](http://blog.makezine.com/archive/2010/04/telemetrum_an_open_hardware_telemet.html) site.  Very cool!
+
+As reported last week, I've been waiting for better GPS antennas to arrive,
+but heavy snow here in Colorado last Friday delayed delivery.  They finally 
+arrived, and as I hoped, they appear to completely solve our signal strength 
+problem!
+
+So... [drum roll, please!]... I am very happy to announce that the first
+production build of [TeleMetrum](http://altusmetrum.org/TeleMetrum) boards 
+and starter kits are now "in stock" at the [Garbee and Garbee](http://gag.com)
+[web store](http://auric.gag.com), along with other products designed by the 
+[Altus Metrum](http://altusmetrum.org) community!
+
+[Keith](http://keithp.com/keithp/) and I are still working on the new 
+Java-based ground station software and user documentation for the 
+system.  Watch this space for updates.  I hope we'll have both ready for 
+download by the time customers actually receive hardware...
index 9281a9067f5275e14bf408ac81dc76c72ec8ebd3..7290bd6eda14edf4b84afc2bf6495911b2bbccf7 100644 (file)
@@ -32,5 +32,38 @@ at [NCR](http://ncrocketry.org) Mile High Mayhem 2010.
 The build began on 21 March 2010, cutting all the phenolic and fin blanks for
 4 "kits" of parts.
 
+The first step was to CNC machine all the rings and bulkheads, then clean them
+up and fit them by sanding carefully.  
+
+Next, we cut out the fins using our radial arm saw, and beveled them by hand 
+using sandpaper flat on a table surface, hand-holding the fins at the desired 
+bevel angle.  Bdale cheated a bit on his fins using his Dremel with sanding
+drum to quickly remove most of the material then finishing up with sandpaper
+on the table... but that requires a very steady hand with a Dremel!  We 
+beveled the leading and trailing edges for looks and to reduce drag, but 
+since these rockets won't break mach on a G the exact profile isn't critical.
+
+Assembly started by sanding the outside of the 29mm phenolic motor mount, 
+and using a piece of angle to mark a reference line along the entire length 
+of the mount.  We use this reference line to get the first fin aligned
+perfectly.  Next, we put the two fin-locking rings on the MMT along with the
+HAMR retainer body, and used the fins to work out from the aft of the MMT
+exactly where the fin-forward ring needed to be, marking the aft edge of this 
+ring's position on the MMT.  The fin forward ring's position is the critical
+part of building a fin can the way we do, so we take extra time to get this
+right.
+
+We then smeared 5-minute hobby epoxy around the MMT at this mark, and 
+pushed the fin-forward
+ring into place from the aft end of the MMT, pushing an epoxy fillet on the
+ring's leading edge, and leaving the aft side of the ring fairly dry.  We
+align the ring so that one of the locking tabs is positioned with one edge 
+on the line up the MMT, so that when we put the first fin in place we can use 
+that line to ensure it's straight along the MMT.  And we're very careful to
+make sure the ring is "square" to the MMT.  While we have some spare epoxy,
+we also smear the front of the MMT and slide on the zipperless fin can ring
+from the front.  Then we let the epoxy cure.  Do *not* glue the aft ring to
+the MMT yet!  That comes much later.
+
 ## Flights