merge projects into airframes, leaving a symlink behind. create a skeletal
[web/gag.com] / rockets / airframes / yikstik / index.html
diff --git a/rockets/airframes/yikstik/index.html b/rockets/airframes/yikstik/index.html
new file mode 100644 (file)
index 0000000..f1ffbac
--- /dev/null
@@ -0,0 +1,835 @@
+<html><head><meta http-equiv="Content-Type" content="text/html; charset=ISO-8859-1"><title>YikStik</title><meta name="generator" content="DocBook XSL Stylesheets V1.73.2"></head><body bgcolor="white" text="black" link="#0000FF" vlink="#840084" alink="#0000FF"><div class="book" lang="en"><div class="titlepage"><div><div><h1 class="title"><a name="id2322390"></a>YikStik</h1></div><div><h2 class="subtitle">A NAR L3 Certification Rocket</h2></div><div><div class="author"><h3 class="author"><span class="firstname">Bdale</span> <span class="surname">Garbee</span></h3></div></div><div><p class="copyright">Copyright © 2008 Bdale Garbee</p></div><div><div class="legalnotice"><a name="id2577753"></a><p>
+        This document is released under the terms of the 
+        <a class="ulink" href="http://creativecommons.org/licenses/by-sa/3.0/" target="_top">
+          Creative Commons ShareAlike 3.0
+        </a>
+        license.
+      </p></div></div><div><div class="revhistory"><table border="1" width="100%" summary="Revision history"><tr><th align="left" valign="top" colspan="2"><b>Revision History</b></th></tr><tr><td align="left">Revision 1.2</td><td align="left">12 January 2009</td></tr><tr><td align="left" colspan="2">
+         Document firmware bug in miniRRC2 and possible impact on flight.
+        </td></tr><tr><td align="left">Revision 1.1</td><td align="left">5 December 2008</td></tr><tr><td align="left" colspan="2">
+         Remove embedded images in favor of references to gallery.gag.com
+        </td></tr><tr><td align="left">Revision 1.0</td><td align="left">28 October 2008</td></tr><tr><td align="left" colspan="2">
+         Recording results of first, and only, flight attempt.
+        </td></tr><tr><td align="left">Revision 0.5</td><td align="left">27 September 2008</td></tr><tr><td align="left" colspan="2">
+          Building checklists
+        </td></tr><tr><td align="left">Revision 0.4</td><td align="left">17 September 2008</td></tr><tr><td align="left" colspan="2">
+          Documenting the build process as it happens
+        </td></tr><tr><td align="left">Revision 0.3</td><td align="left">29 March 2008</td></tr><tr><td align="left" colspan="2">
+          Incorporate ideas from James Russell during initial L3CC review
+        </td></tr><tr><td align="left">Revision 0.2</td><td align="left">27 March 2008</td></tr><tr><td align="left" colspan="2">Cleaned up for initial review</td></tr><tr><td align="left">Revision 0.1</td><td align="left">16 March 2008</td></tr><tr><td align="left" colspan="2">Initial content</td></tr></table></div></div></div><hr></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="chapter"><a href="#id2565537">1. Introduction</a></span></dt><dd><dl><dt><span class="section"><a href="#id2565574">Why "YikStik"?</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2557207">2. Design</a></span></dt><dd><dl><dt><span class="section"><a href="#id2557213">Overview</a></span></dt><dt><span class="section"><a href="#id2557231">Rocksim File</a></span></dt><dt><span class="section"><a href="#id2557244">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#id2557261">Airframe Tubing</a></span></dt><dt><span class="section"><a href="#id2557277">Nose Cone</a></span></dt><dt><span class="section"><a href="#id2557288">Fins</a></span></dt><dt><span class="section"><a href="#id2608670">Centering Rings and Bulkheads </a></span></dt><dt><span class="section"><a href="#id2597438">Motor Retention</a></span></dt><dt><span class="section"><a href="#id2599532">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#id2612550">Avionics</a></span></dt><dt><span class="section"><a href="#id2589090">Payload</a></span></dt></dl></dd><dt><span class="section"><a href="#id2581651">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#id2581446">Expected Performance</a></span></dt><dt><span class="section"><a href="#id2599074">Recovery System</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2592234">3. Construction Details</a></span></dt><dd><dl><dt><span class="section"><a href="#id2599259">Airframe and Couplers</a></span></dt><dt><span class="section"><a href="#id2596433">Fins</a></span></dt><dt><span class="section"><a href="#id2606804">Centering Rings and Bulkheads</a></span></dt><dt><span class="section"><a href="#id2588775">Assembling the Booster Section</a></span></dt><dt><span class="section"><a href="#id2584973">Avionics Bay</a></span></dt><dt><span class="section"><a href="#id2606384">Payload Bay</a></span></dt><dt><span class="section"><a href="#id2607348">Recovery System</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2600260">4. Recovery Systems Package</a></span></dt><dd><dl><dt><span class="section"><a href="#id2595964">Recovery System Description</a></span></dt><dt><span class="section"><a href="#id2609782">Recovery Initiation Control Components</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2585586">5. Stability Evaluation</a></span></dt><dt><span class="chapter"><a href="#id2606777">6. Expected Performance</a></span></dt><dt><span class="chapter"><a href="#id2611290">7.  Checklists </a></span></dt><dt><span class="chapter"><a href="#id2610811">8. Flight Summary</a></span></dt><dt><span class="chapter"><a href="#id2607490">9. Analysis and Conclusions</a></span></dt></dl></div><p>
+       Please note that I stopped adding photos to this document at some 
+       point.  I have many more photos of the YikStik build, but haven't
+       decided how best to present them yet... update coming someday!
+  </p><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2565537"></a>Chapter 1. Introduction</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2565574">Why "YikStik"?</a></span></dt></dl></div><p>
+      This is the rocket I'm designing for my NAR Level 3 certification flight.
+      The general idea is to build a fairly cheap rocket capable of reliably 
+      flying this year's Aerotech level 3 special, which is an M1297W reload.
+      I'd like to be able to fly the prototype of my own altimeter design, and
+      to be able to fly it often on smaller / cheaper reloads at launch sites
+      with modest waivers like Hudson Ranch.
+    </p><p>
+      I want to experiment with vacuum bagging carbon fiber reinforcements, and
+      intend to use my CNC milling machine to cut all the centering rings, etc.
+      The new Giant Leap "Dynawind" tubing feels like a good choice, and if we
+      stick to the 4 inch version we can use a cheap plastic nosecone to keep
+      the cost down.
+    </p><p>
+      Preliminary analysis suggests that a roughly 8 foot rocket made from 4 inch
+      airframe with a 75mm mount and three fins should fly to something around
+      14k feet on the M1297W, could break three miles on the M1850W, and yet
+      could safely fly on reloads as small as a J for economical fun.  Those
+      altitudes mean the certification flight will need to be at a site with a
+      high-altitude waiver like the NCR north site.
+    </p><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2565574"></a>Why "YikStik"?</h2></div></div></div><p>
+        I've always thought the high-gloss red paint job on one of my son's rockets
+        when out on a launch rod in the sun looks a lot like glistening wet 
+        lipstick.  
+      </p><p>
+        Combine that with the fact that my wife who isn't fond of the stuff 
+        refers to lipstick as "yik stick"...  and the rest should be obvious.
+      </p><p>
+        My planned paint scheme is a bright red nosecone, gold tube, and black fin
+        can, which is the mental image I have of what lipstick applicators look 
+        like, most likely from a stick my mother or one of my grandmothers had 
+        when I was a child. 
+      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2557207"></a>Chapter 2. Design</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2557213">Overview</a></span></dt><dt><span class="section"><a href="#id2557231">Rocksim File</a></span></dt><dt><span class="section"><a href="#id2557244">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#id2557261">Airframe Tubing</a></span></dt><dt><span class="section"><a href="#id2557277">Nose Cone</a></span></dt><dt><span class="section"><a href="#id2557288">Fins</a></span></dt><dt><span class="section"><a href="#id2608670">Centering Rings and Bulkheads </a></span></dt><dt><span class="section"><a href="#id2597438">Motor Retention</a></span></dt><dt><span class="section"><a href="#id2599532">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#id2612550">Avionics</a></span></dt><dt><span class="section"><a href="#id2589090">Payload</a></span></dt></dl></dd><dt><span class="section"><a href="#id2581651">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#id2581446">Expected Performance</a></span></dt><dt><span class="section"><a href="#id2599074">Recovery System</a></span></dt></dl></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557213"></a>Overview</h2></div></div></div><p>
+        YikStik is a fairly simple "three fins and a nose cone" dual-deploy 
+        rocket using a 75mm motor mount, 4 inch glass-wrapped phenolic airframe 
+        with zipperless fin can, plastic nose cone, plywood fins, 
+        and lots of glass and carbon fiber reinforcing.  
+        The primary electronics bay will be designed to
+        hold two altimeters, and a distinct payload bay may carry an 
+        experimental altimeter, GPS receiver, and downlink transmitter.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557231"></a>Rocksim File</h2></div></div></div>
+      This is the current working design in Rocksim format:
+      <a class="ulink" href="YikStik.rkt" target="_top"> YikStik.rkt </a></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557244"></a>Drawing from Rocksim</h2></div></div></div><span class="inlinemediaobject"><img src="YikStik.jpg"></span></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557261"></a>Airframe Tubing</h2></div></div></div><p>
+        I intend to cut the airframe components from two 48 inch lengths of 
+        98mm Giant Leap Dynawind tubing.  The 30 inch main bay and 18 inch drogue
+        bay will be cut from one length, while the 33 inches of fin can, 2 inches
+        of electronics bay, and 8 inches of payload bay will be cut from the 
+        second.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557277"></a>Nose Cone</h2></div></div></div><p>
+        I intend to use a Giant Leap "Pinnacle" 3.9 inch nose cone.  
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2557288"></a>Fins</h2></div></div></div><p>
+        The fins are designed from scratch, and I intend to build them up from
+        two layers of 1/8 inch birch plywood, three layers of carbon fiber, and
+        two layers of 6 oz glass.  The stack will be glass, carbon fiber, 
+        plywood, carbon fiber, plywood, carbon fiber, glass.  The edges of the
+        plywood will be routed to give a modified airfoil shape to the finished
+        fins.  The stack will be laminated using West Systems epoxy products
+        and vacuum bagged.
+        The shape is a compromise between mass, surviving Mach-transition stress,
+        optimal stability margin, and avoiding damage during handling and on 
+        contact with the ground during recovery.
+      </p><p>
+        The fins will be locked in to milled slots in two of the centering rings,
+        and will be epoxied to the motor mount with glass reinforcing tape. 
+        The airframe will be slotted to allow the completed motor mount / fin 
+        assembly to be inserted from the rear, with fillets of epoxy applied 
+        inside and outside the airframe after insertion.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2608670"></a>Centering Rings and Bulkheads </h2></div></div></div><p>
+        All centering rings and bulkheads will be custom machined from 3/8 inch 
+        birch plywood using my 3-axis CNC milling machine.  Some rings will use
+        laminated pairs of 3/4 inch total thickness to enable use of threaded
+        inserts for 1/4-20 rail button screws or deep routing for fin alignment
+        slots.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2597438"></a>Motor Retention</h2></div></div></div><p>
+        I will embed three 8-24 T-nuts in the aft centering ring spaced to allow
+        the use of home-made Kaplow clips to retain 75mm motors.
+        The same holes may be used to attach custom motor mount adapters for
+        smaller diameter motors.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2599532"></a>Electronics</h2></div></div></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2612550"></a>Avionics</h3></div></div></div><p>
+          The recovery system will feature dual redundant barometric altimeters
+          in an electronics bay similar to the LOC design located between the
+          drogue and main parachute bays.
+        </p><p>
+          A PerfectFlite MAWD will be flown as the primary altimeter and to 
+          record the flight altitude profile.
+          A MissileWorks Mini-RRC2 will fly as backup altimeter and to 
+          directly capture max velocity.
+        </p><p>
+          Each altimeter will have a separate battery and power switch. A 4PDT 
+          slide switch will be used as a SAFE/ARM switch configured to interrupt 
+          connectivity to the ejection charges.
+        </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2589090"></a>Payload</h3></div></div></div><p>
+          I hope to fly 
+          <a class="ulink" href="http://altusmetrum.org/" target="_top">
+            my own altimeter design 
+          </a>
+          as a payload in a short payload section just behind the nose cone.  
+          I have acquired the pieces to add a GPS receiver and RF downlink using
+          ham radio frequencies to the payload to track the rocket's position 
+          during flight.  
+          This is not essential to fly,
+          but could make recovery simpler and would just be fun to fly if I can
+          get it all working and suitably ground and/or flight tested in time.
+        </p></div></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2581651"></a>Stability Evaluation</h2></div></div></div><p>
+        This design has been thoroughly analyzed using 
+        <a class="ulink" href="http://www.apogeerockets.com/rocksim.asp" target="_top">
+          RockSim
+        </a>
+        with motors ranging from the
+        Cesaroni J285 through the Aerotech M1850W and appears to be 
+        unconditionally stable across that range.  The lowest margin is around
+        1.2 seen with the M1297W planned for my level 3 certification flight,
+        albeit with many masses still only roughly estimated.  
+      </p><p>
+        These simulations will be refined as the build proceeds and as-built
+        stability verified before flight. 
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2581446"></a>Expected Performance</h2></div></div></div><p>
+        The Aerotech M1297W reload should carry this vehicle without ballast 
+        to just over 14 thousand feet AGL.  It should make over 16 thousand 
+        feet AGL on an M1850W, and should fly stably to roughly 2.5k feet AGL 
+        on a Cesaroni J285.
+      </p><p>
+        Hitting optimal mass on the largest motors may require 
+        ballast, depending on final build weight.
+        My plan is to fly without ballast on the certification flight, 
+        trading some altitude for a slower and softer recovery.  
+        If the cert succeeds, then I might try an optimal mass 
+        flight sometime later on an M1850W or equivalent "bigger M" 
+        reload to join the "three mile club".
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2599074"></a>Recovery System</h2></div></div></div><p>
+        The recovery system will use dual redundant barometric altimeters firing
+        black powder charges. 
+        At apogee, a drogue chute will deploy from just forward of the fin can,
+        with size selected for an approximately 100 ft/sec descent rate.
+        At a preset altitude, a main chute will be deployed to achieve recovery
+        of the bulk of the rocket at under 20 ft/sec.  
+        The main chute will be packed in a deployment bag, configured as a 
+        "freebag" and pulled out of the airframe by a second drogue chute.  This
+        drogue will recover the nosecone and deployment bag separately from the
+        remainder of the rocket which will recover under the main.
+      </p><p>
+        I intend to sew the parachutes from scratch using a design documented by 
+        <a class="ulink" href="http://www.vatsaas.org/rtv/systems/Parachutes/Chute.aspx" target="_top">
+          Team Vatsaas
+        </a>
+        using 1.9oz rip-stop nylon and 550 lb parachute cord.  
+        If time runs short, equivalent chutes from SkyAngle, 
+        Rocketman, or Giant Leap could be substituted (at significantly higher 
+        cost).
+      </p><p>
+        The deployment bag will probably be purchased from Giant Leap.  The
+        recovery harness will probably use tubular kevlar, also from Giant Leap.
+      </p><p>
+        The recovery system attachment points will all use 1/4 inch u-bolts with
+        nuts, washers, and backing plates through bulkheads except for the fin
+        can.  The fin can has insufficient room between the motor mount and
+        the airframe inner wall for nuts and washers, so an alternative means of
+        recovery system attachment is required.  The fin can will be equipped 
+        with either a 3/16 inch stainless steel aircraft cable loop, or a loop 
+        of 1/2 inch tubular kevlar, bonded to the motor mount.
+        If available, a screw-eye attached to the forward motor closure may be 
+        used instead of or in addition to this recovery attachment loop.
+      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2592234"></a>Chapter 3. Construction Details</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2599259">Airframe and Couplers</a></span></dt><dt><span class="section"><a href="#id2596433">Fins</a></span></dt><dt><span class="section"><a href="#id2606804">Centering Rings and Bulkheads</a></span></dt><dt><span class="section"><a href="#id2588775">Assembling the Booster Section</a></span></dt><dt><span class="section"><a href="#id2584973">Avionics Bay</a></span></dt><dt><span class="section"><a href="#id2606384">Payload Bay</a></span></dt><dt><span class="section"><a href="#id2607348">Recovery System</a></span></dt></dl></div><p>
+       I have collected all of my
+       <a class="ulink" href="http://gallery.gag.com/rockets/yikstik" target="_top">
+       build photos
+        </a>
+       in one place, they may show better than I can explain how various
+       aspects of YikStik went together.
+      </p><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2599259"></a>Airframe and Couplers</h2></div></div></div><p>
+        The tubing for the airframe, couplers, and motor mount was all cut
+        using a carefully aligned and adjusted power mitre saw, and the ends
+        lightly sanded to remove rough spots.  
+        The main and drogue bays were cut from one 48 inch length of Giant 
+        Leap 98mm Dynawind tubing, the fin can, electronics bay, and payload 
+        bay were cut from the second.  The three couplers for the fin can, 
+        electronics bay, and payload bay were cut from Giant Leap 98mm phenolic
+        coupler stock.  And the motor mount was cut from Giant Leap 75mm
+        phenolic airframe stock.  
+        Note that the motor mount is the longest piece because of 
+        the zipperless design with full-length motor mount.
+      </p><p>
+        The airframe tubing selected includes a wrap of 10oz glass in epoxy
+        over the base phenolic tubing (visible in some photos as a 
+        shine on the outside of the tubing), 
+       but the coupler stock is unreinforced.
+        To ensure the couplers can handle the anticipated loading, I reinforced
+        each with one layer of interior carbon fiber, using the "kitchen 
+        vacuum bagging" technique documented by 
+        <a class="ulink" href="http://www.jcrocket.com/kitchenbagging.shtml" target="_top"> 
+          John Coker.  
+        </a>
+      </p><p>
+        This was my first hands-on experience working with carbon fiber.  The
+        end of the coupler nearest the unit during bagging experienced some
+        crushing of the fibers right at the end.  It doesn't matter for this
+        project because each of the couplers will have at least one end fitted
+        with a bulkhead or centering ring, but in the future I'll be tempted 
+        to cut the coupler stock a bit long before bagging and trim to length
+        after reinforcing to get "perfect" ends.  The technique worked 
+        marvelously otherwise, and the resulting couplers look and should work
+        great!
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2596433"></a>Fins</h2></div></div></div><p>
+        Six pieces of 1/8 inch birch plywood were stacked, edge-aligned on what
+        would be the fin root edge, and clamped.  The outline of the fin design
+        was marked in pencil, and three 1/8 inch holes drilled through the
+        stack inside the fins to allow using 4-40 screws and nuts to hold the
+        blanks together while making the initial cuts, so that they would all be
+        matched in size.  The clamps were removed to avoid interference
+        during cutting.  The fin outline was then cut using a radial arm saw.
+      </p><p>
+        A router table with 1/8 inch
+       roundover bit was then used to round over the outer edge, 3 blanks on
+        one side and three on the other.  This edge might have been left square,
+        but I prefer the look and feel of rounding.  The router table with a 1/2
+        inch diameter straight cutting bit and a fin beveling jig was used
+        to impart a 10-degree bevel on the leading and trailing edge of each fin
+        blank, again 3 on one side and three on the other.  The resulting 6 
+        blanks thus form 3 pairs of fin components with a modified 
+       airfoil shape.
+      </p><p>
+        The fin assembly started with a simple lamination of two layers of ply
+        sandwiching a layer of carbon fiber.  Each fin used "one pump" of West
+        Systems epoxy and the stack was vacuum bagged using the Foodsaver with
+        wide bagging material.  To keep everything flat while the epoxy cured,
+        the stack of fins was sandwiched between two unused extra shelves for 
+        a storage cabinet I had on hand 
+       (particle board covered in laminate, very
+        flat and smooth, nearly inflexible at this loading), and stacked with 
+        about 75 lbs of loose barbell weights.  
+      </p><p>
+        On one of the three fins, the plywood layers are out of alignment by
+        1-2mm in the longest axis.  The other two are nearly perfect.  Light
+        sanding should allow me to match them before laminating the outer layers
+        of carbon fiber and glass.
+      </p><p>
+        After the fins cured, they were bulk sanded with medium and fine 
+        sandpaper and an electric palm sander.  Final sanding of the leading
+        and trailing edges was done using 400 grit paper on a flat surface,
+        holding the fin the way you'd sharpen a knife against a stone.  The
+        results seem good, all three fins match pretty closely.
+      </p><p>
+        A fin holding jig was cut from 1/8" hardboard using my rotary tool 
+        with a fiber cutoff wheel.  The fin slots were made to be a snug fit.
+        A small batch of epoxy was used to apply a bead to the root edge and
+        tab at the leading edge, then the fins were installed against the 
+        motor mount and locked into place with the jig to cure.  The centering
+        ring that locks the aft edge of the fins was dry-fit during this
+        operation to ensure proper alignment, but was not glued yet.  It will
+        go on after the airframe and internal fin filets are installed.
+      </p><p>
+        The fins were reinforced with fiberglass and epoxy.  Masking tape was
+        used to carefully delineate where the airframe ID will be, then 6oz
+        glass 14.25" by 3.5" was epoxied fin-fin across the MMT.  Strips of
+        8.6oz "boat tape" fiberglass were worked into the joints with more
+        epoxy, and a sheet of plastic covered by ziplog bags of water were
+        used to hold things in place during the initial curing.  The three
+        sides were done one at a time and allowed to cure before proceeding.
+        The results look good, and in combination with internal and external
+        airframe filets should yield a super-strong fin can.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2606804"></a>Centering Rings and Bulkheads</h2></div></div></div><p>
+        Pairs of 3/8 inch birch plywood blanks were laminated using Titebond
+        wood glue and clamped while curing to form 3/4 inch blanks for centering
+        rings.  From a strength perspective, 3/8 inch should suffice, but there
+        are two reasons for going with thicker blanks in some places.  The first
+        is that the rail buttons chosen use 1/4-20 mounting screws, and threaded
+        inserts in that size are nearly 3/8 inch outside diameter 
+       (and thus would
+        tear up a ring only 3/8 inch thick on insertion).  The second is that I
+        like to mill slots in the centering rings on each end of the fins to
+        "lock" the fins into position.  Doubling the blanks used to cut those
+        rings will allow me to cut 1/4 inch deep fin slots and still have a half
+        inch of unmolested wood in the rings for strength.
+      </p><p>
+        The aft centering ring and the one just aft of the zipperless
+        coupler section were edge-drilled for the installation of brass
+        1/4-20 threaded inserts to hold rail buttons.  The inserts were
+        locked in place with epoxy, then ground down until nothing protruded
+        beyond the OD of the ring.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2588775"></a>Assembling the Booster Section</h2></div></div></div><p>
+        The forward two centering rings were installed on the MMT using
+        JB Weld high-temperature epoxy, and incorporating an aircraft cable
+        loop for recovery system retention since there just wasn't room for
+        u-bolts.
+      </p><p>
+        The ring at the leading edge of the fins was initially installed 
+        assuming the aft ring would be nearly flush with the rear of the MMT
+        and equipped with Kaplow-clip style retainers, but before the fins
+        were installed a Giant Leap Slimline Tailcone Retainer for 75mm motor
+        in 98mm airframe became available thanks to Tim Thomas, and so this
+        ring was cut out and replaced with another one inch farther forward 
+        to allow installation of the tailcone at the rear of the MMT.  I 
+        really like the tailcone on my Vertical Assault kit, and think it'll
+        work out to be a great addition for this rocket!
+      </p><p>
+        An alignment jig for the fins was carefully marked out and then cut 
+        from 1/8 inch hardboard using my rotary tool and abrasive cutoff wheel.
+        The fins were then epoxied at the root and short leading edge to the
+        motor mount tube and into the slots in the forward centering ring,
+        and held rigidly aligned by the jig until the epoxy set.  The fins
+        were then masked at what would be the ID of the airframe tube, and
+        reinforced with 6oz glass fin-fin across the motor mount tube between
+        each fin pair, further reinforced with strips of 1 inch glass "boat
+        tape" at each fin root joint.
+      </p><p>
+        The airframe tubing section was carefully marked for fin slots, which
+        were then cut using my rotary tool with abrasive cutoff wheel.  Epoxy
+        was applied ahead of the center two rings as the frame was slid into
+        place, and the frame left standing upright until the epoxy set to
+        hopefully form ring-fin fillets on those two rings.  The interior
+        fin to airframe joints were reinforced one fin at a time using West
+        Systems epoxy will milled glass as a filler.  A long 3/8" dowel was
+        used to place and smooth these interior filets.  The aft centering ring
+        was installed by pouring West Systems epoxy in the three fin-fin gaps, 
+        placing the ring, then standing the airframe up to allow the epoxy to
+        flow over the forward surface of the ring and into the gaps between it,
+        the motor mount, and the airframe tubing.  After it set, the booster
+        was placed nose-down, the airframe gaps behind the fins were taped,
+        and more epoxy was applied to seal the aft of the ring to the tubes.
+        Before this epoxy set, JB Weld was used to glue the tail cone retainer
+        in place on the MMT.  
+      </p><p>
+        The exterior fin to
+        airframe joints were filleted using 5-minute epoxy thickened with 
+        baby powder and smoothed with the tip of a plastic spoon, which I 
+        learned about building the Vertical Assault kit.  Gives great results,
+        and allowed all 6 joints to be done in one session.  The space
+        above the top surface of the forward centering ring and between the 
+        motor mount and zipperless-design coupler tubing was filled with epoxy
+        and milled glass.  Minor gaps in the airframe behind each fin were
+        filled with epoxy clay.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2584973"></a>Avionics Bay</h2></div></div></div><p>
+        The avionics bay contains the two commercial altimeters used to
+        record information about the flight and deploy the drogue and main
+        recovery systems.  It is constructed of a piece of Giant Leap 98mm
+        coupler tubing reinforced with an interior wrap of vacuum-bagged
+        carbon fiber, and a 2 inch length of Giant Leap 98mm DynaWind airframe
+        tubing.  
+      </p><p>
+        The bulkheads are custom-milled from 3/8 inch birch plywood
+        milled so that about 3/16" fits inside the coupler and the remainder
+        seals the end of the coupler and just fits inside the airframe.  Each
+        bulkhead has a u-bolt for attaching the recovery harnesses, and dual
+        CPVC end caps as ejection charge holders with screw terminal blocks
+        from Missile Works to attach the igniters.  Two lengths of 1/4 inch
+        all-thread with nuts and washers tie the bulkheads together, with
+        wing-nuts used on one end to allow for easy disassembly.
+      </p><p>
+        A sled was fabricated to hold the altimeters and batteries.  It
+        consists of 1/8 inch birch ply laminated with 6oz fiberglass on each 
+        side, epoxied to cardboard tubes taken from the packaging for Aerotech
+        igniters that slide over the all-thread, further reinforced with nylon
+        ties at each end.  The tubes are staggered one on either side so that
+        the sled goes right up the center of the airframe tubing.
+      </p><p>
+        Two "centering rings" containing three each 6-32 threaded inserts are
+        epoxied inside the bay to provide hard points for attaching the 
+        airframe tubes for the drogue and main recovery bays.  The inside
+        diameter of these rings is notched for the avionics sled, and thus
+        these rings also provide physical support for the sled.
+      </p><p>
+        Three rotary switches from Missile Works are installed through the
+        short airframe tubing section, drilled such that they end up 
+        essentially flush with the outside of the airframe, clamp the coupler
+        tubing, and project inside the bay.  Two are wired as SPST switches
+        for power to the two altimeters, the third is wired as a DPST switch
+        that open-circuits the igniters for the required "safe/arm" function
+        called for in the NAR L3 certification requirements.
+      </p><p>
+        The wiring of the avionics bay is documented in the attached 
+        schematic diagram.  Connectors were used to allow each bulkhead and
+        the switches in the housing to be quickly detached from the sled.
+        The connectors are 9-pin D shells for the switch wiring, and 4-pin
+        Molex connectors like those used on older PC hard drive power cables
+        for the bulkheads.  To allow use of a single switch pole for the 
+        safe/arm function for each altimeter, the two igniters attached to
+        each altimeter are safed by interrupting the common return lines as
+        shown in the schematic.  
+      </p><p>
+        Sizing the static port for the avionics bay was done by applying the
+        formulas suggested by PerfectFlite and Missile Works for their
+        respective altimeter products, then comparing the results with each
+        other and with information found on the web.  I've personally had 
+        better luck with single ports than with multiple holes, perhaps because
+        I've been working with relatively small rockets.  Regardless, I'm 
+        sticking with what I know and will use a single static port hole here.
+      </p><p>
+        The measured dimensions
+        of the avionics bay as constructed are 95mm ID and approximately 250mm
+        between bulkheads.  This works out to 108.73 cubic inches before
+        accounting for the volume of the sled, electronics, and wiring and
+        other components inside the bay.  By the PerfectFlight formula, the 
+        static port should be 0.221 inches in diameter.  By the Missile Works 
+        formula for a bay over 100 cubic inches the answer is 0.261 inches.  
+        The closest standard drill size, which happens to split the difference,
+        is 0.250 inches.  Easy enough!
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2606384"></a>Payload Bay</h2></div></div></div><p>
+        The construction of the payload bay is very similar to the avionics
+        bay, except that there is a hard-epoxied rear bulkhead, and only one
+        screw ring to hard-mount the nose cone.  The forward end of the 
+        payload bay is open to the open interior volume of the nose cone in
+        anticipation of extending downlink antennas above the carbon fiber 
+        reinforcement in the coupler and into the nose cone, since carbon 
+        fiber is opaque to RF.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2607348"></a>Recovery System</h2></div></div></div><p>
+        Pre-sewn 1/4 inch tubular kevlar harness sections were purchased 
+        from Giant Leap, along with a small kevlar deployment bag and two
+        kevlar chute protectors.
+      </p><p>
+        For an apogee drogue, I plan to fly a Public Missiles 4 x 144 inch
+        nylon streamer.  It will be protected with one of the kevlar blankets
+        and attached to one of the kevlar harness sections holding the booster
+        to the avionics bay.
+      </p><p>
+        The main parachute will be sewn from 1.9 oz rip-stop nylon purchased
+        from the 
+        <a class="ulink" href="http://www.milloutletfabric.com/" target="_top">
+          Mill Outlet Fabric Shop
+        </a>
+        in Colorado Springs.  Using the spreadsheet from 
+        <a class="ulink" href="http://www.vatsaas.org/rtv/systems/Parachutes/Chute.aspx" target="_top">
+          Team Vatsaas
+        </a>
+        I calculate that we want an 8 foot chute to keep the airframe less
+        nose cone and payload bay below 20 feet per second at touch-down.
+      </p><p>
+        To extract the main chute and recover the nose cone and payload bay,
+        a 3 foot parachute from BSD Rocketry will be packed in a kevlar
+        blanket ahead of the main chute deployment bag, attached by kevlar
+        harness to the nose cone and payload bay assembly, and to the top of
+        the deployment bag.  This assembly will recover separately from the
+        rest of the rocket.
+      </p><p>
+        The altimeters are programmed such that the MAWD fires its drogue
+        charge at apogee and its main charge at 1100 feet.  The miniRRC2
+        is programmed to fire its drogue charge two seconds past apogee, 
+        and its main charge at 900 feet.  Thus the MAWD is primary and the
+        miniRRC2 is the backup.  Since the M1297W has a burn time of about
+        5 seconds, mach inhibit is programmed on both altimeters to 8 seconds.
+      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2600260"></a>Chapter 4. Recovery Systems Package</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2595964">Recovery System Description</a></span></dt><dt><span class="section"><a href="#id2609782">Recovery Initiation Control Components</a></span></dt></dl></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2595964"></a>Recovery System Description</h2></div></div></div><p>
+        This rocket uses dual deployment.  
+      </p><p>
+        The apogee event separates the
+        airframe between the zipperless-design booster section and the 
+        drogue bay.  These two sections are linked by a Giant Leap 20 foot
+        pre-sewn 1/4 inch tubular kevlar assembly, attached to which is a
+        Public Missiles 4 x 144 inch red nylon streamer packed in a Giant Leap
+        kevlar chute protection pad.
+      </p><p>
+        The main event separates the airframe between the forward payload bay
+        and the main bay.  Attached to the nose cone and payload bay assembly
+        is a Giant Leap 15 foot pre-sewn 1/4 inch tubular kevlar assembly, 
+        attached "free bag" style to the top of a Giant Leap deployment bag
+        containing the main chute.  A 36 inch BSD Rocketry nylon parachute
+        packed in a Giant Leap kevlar chute protection pad serves to pull the
+        deployment bag off the main chute, after which it allows for safe
+        recovery of the nose cone and payload assembly at just under 20 feet
+        per second.
+      </p><p>
+        The 8 foot main chute is home-made from 1.9 oz rip-stop nylon using 
+        the design documented by 
+        <a class="ulink" href="http://www.vatsaas.org/rtv/systems/Parachutes/Chute.aspx" target="_top">
+          Team Vatsaas.
+        </a>
+        It is attached to the remainder of the rocket using another Giant Leap
+        pre-sewn 1/4 inch tubular kevlar assembly.
+      </p><p>
+        The anchor points are all 5/16 inch u-bolts, except for on the booster
+        which is equipped with an embedded loop of 3/16 inch stainless aircraft
+        cable.  All connections are made with suitable quick-links.
+      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2609782"></a>Recovery Initiation Control Components</h2></div></div></div><p>
+        The LOC-style avionics bay between the main and drogue bays is 
+        populated with two commercial altimeters, a PerfectFlite MAWD 
+        and a Missile Works miniRRC2.  
+        Each is powered by a dedicated 9V battery, and has a 
+        dedicated on/off power switch mounted for access from outside the 
+        rocket.  Additionally, a single safe/arm switch with two poles is used
+        to interrupt the return circuits from the igniters to each altimeter.
+        See the attached schematic of the avionics bay contents for more
+        details.
+      </p><p>
+        The bulkheads at each end of the avionics bay have two CPVC end caps
+        for ejection charge holders, and two-terminal screw blocks for 
+        attachment of electric matches purchase from Giant Leap used to ignite
+        Goex 4F black powder ejection charges.  Each charge holder and terminal
+        block pair is labelled as to main or backup since the charges will be
+        different for each.
+      </p><p>
+        The    
+        <a class="ulink" href="http://www.info-central.org/recovery_powder.shtml" target="_top">
+          Info Central Black Powder Sizing
+        </a>
+        page is the most authoritative site I've found on this topic.
+        Each of the main and drogue bay interfaces will use 2 2-56 nylon screws
+        as shear pins, each of which needs 35 pounds of force or so to shear.
+        Designing for 15psi puts us between 150 and 200 pounds total force in
+        a 4 inch airframe.  The formula is thus 0.006 grams times diameter 
+        squared in inches times length in inches.
+      </p><p>
+        My drogue bay is 3.9 inches ID and 8 inches long, or 95.52 cubic 
+        inches.  That works out to about 0.73 grams.  However, there will be
+        some volume in the motor mount tube above the motor that also must
+        be accounted for, enough to nearly double the total volume when flying
+        on the M1297W certification motor.  Also, since this charge must fire 
+        reliably at 15-18k feet above ground level of around 5k feet, such 
+        that combustion is likely to be incomplete, we need to add some margin.
+      </p><p>
+        My main bay is 3.9 inches ID and about 25 inches between bulkheads,
+        or about 298.50 cubic inches.  That works out to 2.28 grams.  
+      </p><p>
+        Sanity checking, PerfectFlite recommends that a 4F black powder charge 
+        be sized by multiplying the volume of the bay in cubic inches by 0.01 
+        grams.  That yields about 1.8 grams for the drogue bay and 3 grams for
+        the main bay.
+      </p><p>
+        That suggested to me that a good starting point for ground testing is
+        1.5 grams for the drogue bay and 2.5 grams for the main bay.  Ground
+        tests were done using the PC interface cable for the MAWD routed in
+        through the static test port to manually trigger ejections.  Testing
+        of the apogee bay showed that 1.5 grams was sufficient for deployment
+        and 1.8 grams was more authoritative.  A single test of main deploy 
+        with 2.5 grams gave a nearly perfect result.
+        Given the altitude of our expected apogee, we should be generous with
+        the apogee charge, perhaps using 2.0 grams for the primary.  The main 
+        will deploy at an altitude below where the tests were performed, so
+        no adjustment in charge size should be required.
+      </p><p>
+        Descent rate of the nose cone and payload bay which mass just under
+        1kg will be less than 20 feet per second with a 36 inch chute based
+        on manufacturer recommendations and Rocksim v8 simulation.
+        Descent rate of the remainder of the rocket under the 8 foot chute
+        should be about 18 feet per second by the spreadsheet provided by
+        the designers of this chute pattern, sanity checked using the descent
+        rate tables of similar commercial parachute designs, like those from
+        The Rocketman.
+      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2585586"></a>Chapter 5. Stability Evaluation</h2></div></div></div><p>
+      Simulation using Rocksim v8 with a variety of motors showed that the
+      rocket is unconditionally stable with all motors likely to be flown.
+      The worst-case stability among 75mm motors is actually with the 
+      M1297W chosen for the certification flight, at margin 1.05.  This is
+      because the front of this motor falls almost exactly at the CP.  Using 
+      a longer motor like the M1850W raises the initial stability margin to
+      1.10 because the front fuel grain is ahead of the CP, and lesser
+      motors also increase the stability because less mass is behind the CP.
+      The smallest motor I can conceive of flying in this rocket (a Cesaroni
+      J285) would leave us overstable with margin 3.79 on the way to about
+      1800 feet apogee.
+    </p></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2606777"></a>Chapter 6. Expected Performance</h2></div></div></div><p>
+      On the certification flight, using an Aerotech M1297W reload and
+      associated hardware, the anticipated apogee is round 14,700 feet.  This
+      is just under 75% of the NCR North Site standing waiver of 20,000 feet.
+    </p><p>
+      The highest altitude simulated would be achieved with an Aerotech 
+      M1850W reload at nearly 18,000 feet.  The lowest altitude simulated 
+      is with a Cesaroni J285 and Slimline adapters to just over 1800 feet.
+    </p><p>
+      add description of anticipated flight profile here, including launch
+      weight, estimated drag coefficient, velocity leaving the rail, max
+      expected velocity, altitude, and acceleration
+    </p></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2611290"></a>Chapter 7.  Checklists </h2></div></div></div><div class="orderedlist"><ol type="1"><li> 
+        Planning
+        <div class="orderedlist"><ol type="1"><li>
+            Pick a club launch with suitable waiver and facilities to 
+            support flight.
+          </li><li>
+            Confirm L3CC member(s) available to attend selected launch.
+          </li><li>
+            Confirm that required loaner motor hardware will be available at launch.
+          </li><li>
+            Notify launch sponsor (club president) of intended flight.
+          </li><li>
+            Notify interested friends of intended flight.
+          </li><li>
+            Perform final pre-flight simulation with as-built masses, etc.
+          </li><li>
+            Gather consummables and tools required to support flight
+            <div class="orderedlist"><ol type="1"><li>
+                fresh 9V batteries
+              </li><li>
+                black powder 
+              </li><li>
+                e-matches 
+              </li><li>
+                motor retainer snap rings
+              </li><li>
+                small nylon wire ties
+              </li><li>
+                cellulose wadding material
+              </li><li>
+                masking tape
+              </li><li>
+                screwdriver for phillips-head airframe screws
+              </li><li>
+                small straight-blade screwdriver for power switches
+              </li><li>
+                motor reload kit
+              </li><li>
+                high temperature grease
+              </li><li>
+                long small diameter dowels for igniter insertion
+              </li></ol></div></li></ol></div></li><li> 
+        Before Leaving Home 
+        <div class="orderedlist"><ol type="1"><li>
+            program altimeters for suitable mach delay and recovery deployment
+            <div class="itemizedlist"><ul type="disc"><li>
+                MAWD
+                <div class="itemizedlist"><ul type="circle"><li>
+                    8 seconds mach delay
+                  </li><li>
+                    1500 foot main deploy
+                  </li></ul></div></li><li>
+                
+                miniRRC2
+                <div class="itemizedlist"><ul type="circle"><li>
+                    8 seconds mach delay
+                  </li><li>
+                    1000 foot main deploy
+                  </li><li>
+                    2 seconds apogee delay
+                  </li><li>
+                    no main delay
+                  </li><li>
+                    dual deploy
+                  </li><li>
+                    ops mode 16 (default)
+                  </li></ul></div></li></ul></div></li><li>
+            assemble all recovery system components and ensure everything fits
+          </li><li>
+            confirm wiring and operation of altimeter power and safe/arm switches
+          </li><li>
+            Ground test recovery system to confirm suitable black powder 
+            charge sizing
+          </li></ol></div></li><li>
+        Pre-Flight
+        <div class="orderedlist"><ol type="1"><li>
+            confirm payload batteries in good condition, bay loaded, power switch works
+          </li><li>
+            confirm reception of signals from transmitter(s) in payload bay
+          </li><li>
+            install fresh 9V batteries for altimeters on avionics bay sled
+          </li><li>
+            inspect altimeters and associated avionics bay wiring for visible faults
+          </li><li>
+            close up avionics bay 
+          </li><li>
+            install e-matches, confirming resistance of 1-2 ohms and fit in charge cups
+          </li><li>
+            power up altimeters, operate safe/arm switch, and confirm e-match continuity
+          </li><li>
+            load BP charges into charge cups 
+            <div class="orderedlist"><ol type="1"><li>
+                Drogue Primary Charge - 2.0 grams 4F BP
+              </li><li>
+                Drogue Backup Charge - 2.5 grams 4F BP
+              </li><li>
+                Main Primary Charge - 2.5 grams 4F BP
+              </li><li>
+                Main Backup Charge - 3.0 grams 4F BP
+              </li></ol></div></li><li>
+            connect recovery harnesses and install recovery bay airframe sections
+          </li><li>
+            power up altimeters, operate safe/arm switch, and confirm e-match continuity
+          </li><li>
+            safe and power-down the altimeters
+          </li><li>
+            load main recovery bay, attaching nosecone and payload bay assembly
+          </li><li>
+            install nylon 2-56 screws as shear pins between main bay and payload bay
+          </li><li>
+            load drogue recovery bay, feeding harness end through fin can motor tube
+          </li><li>
+            install nylon 2-56 screws as shear pins between drogue bay and fin can
+          </li><li>
+            load motor per manufacturer instructions
+          </li><li>
+            attach forged eye-bolt to forward closure if not already present
+          </li><li>
+            attach drogue harness to eye-bolt on forward motor closure
+          </li><li>
+            install motor in motor mount
+          </li><li>
+            install motor retention snap rings
+          </li><li>
+            prepare igniter for later installation by attaching to long 1/8" dowel
+          </li><li>
+            confirm all screws in place, avionics off and safe
+          </li><li>
+            fill out a launch card
+          </li><li>
+            notify RSO/LCO of readiness for inspection and launch, obtain a rail
+            assignment and permission to move rocket to launch pad for final prep
+          </li><li>
+            coordinate readiness with support team members, photographers, observers
+          </li></ol></div></li><li>
+        Final Prep
+        <div class="orderedlist"><ol type="1"><li>
+            move rocket to launch area
+          </li><li>
+            clean and lubricate launch rail if necessary
+          </li><li>
+            power up payload and confirm reception of signals from transmitter(s)
+          </li><li>
+            mount rocket on launch rail, rotate to vertical
+          </li><li>
+            power up primary altimeter, confirm expected beep pattern
+          </li><li>
+            power up backup altimeter, confirm expected beep pattern
+          </li><li>
+            arm ejection charges
+          </li><li>
+            confirm altimeters both giving expected beep patterns for igniter continuity
+          </li><li>
+            install igniter and connect to launch control system
+          </li><li>
+            capture GPS waypoint for rail location
+          </li><li>
+            smile for the cameras, make sure we have enough "foil Murphy!" shots taken
+          </li><li>
+            retreat to safe area behind LCO
+          </li><li>
+            confirm continued reception of transmitter signal(s) from payload bay
+          </li><li>
+            confirm photographers and observers are ready and know what to expect
+          </li><li>
+            make sure binoculars and backpack with water and recovery tools are at hand
+          </li><li>
+            tell RSO and LCO we're ready to launch
+          </li><li>
+            try to relax and enjoy watching the flight!
+          </li></ol></div></li><li>
+        Recovery
+        <div class="orderedlist"><ol type="1"><li>
+            track rocket to landing site
+          </li><li>
+            capture GPS waypoint of landing site, take lots of photos
+          </li><li>
+            note any damage
+          </li><li>
+            gather up and roughly re-pack recovery system for return to flight line
+          </li><li>
+            bring the rocket to observers for post-flight inspection
+          </li></ol></div></li></ol></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2610811"></a>Chapter 8. Flight Summary</h2></div></div></div><p>
+       YikStik was flown on an M1297W on Saturday morning at NCR's Oktoberfest
+       2008.  The boost was beautiful.  Unfortunately, we lost visual as the
+       rocket climbed into high clouds near apogee.  Radio tracking signals
+       remained strong for several minutes, then disappeared.  We were 
+       confused by viewing what we thought was YikStik descending before
+       signals were lost in about the right direction, but now believe we 
+       were actually watching a previously launched rocket and did not see
+       YikStik descend.  This confusion prevented location of any of the
+       rocket until Sunday evening, after I had left the launch area.
+      </p><p>
+       After an extensive search, the nose cone assembly was finally found
+       with the Walston tracking gear nearly 3.5 miles down range.  The
+       remainder of the rocket has not been found despite extensive searching
+       on the ground and from the air.  
+      </p><p>
+       Reward if returned posters were placed in the area during the week 
+       following the launch but have elicited no useful reponses yet.
+      </p></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2607490"></a>Chapter 9. Analysis and Conclusions</h2></div></div></div><p>
+       Consideration of how the nose cone ended up where it did suggests 
+       we may have had an apogee deployment of the main, perhaps due to 
+       stress on the shear pins before launch, during boost, or during 
+       apogee drogue deployment causing them to break early.
+      </p><p>
+       It is unfortunate that we were confused by seeing another rocket 
+       descending about the expected amount of time after YikStik's launch
+       in approximately the right direction.  This caused us to believe that
+       the rocket was much closer than the nose cone turned out to be, causing
+       us to waste a lot of time searching in an area too close to the launch
+       site. 
+       It also caused us to assume something really weird had happened to the 
+       transmitters, such that the tracking signal was suddenly lost long 
+       after the rocket was on the ground, instead of what seems to really 
+       have happened, which is that the rocket was farther away descending 
+       after a main deployment at apogee, and the loss of signal was simply
+       due to dropping below a ridge line a couple miles from the launch site.
+       I can't help but think that if we'd been 
+       looking in the right area sooner after the launch that we might have
+       found the rocket before someone else apparently picked it up.
+      </p><p>
+       I regret the decision to use a "free bag" configuration of the 
+       deployment bag.  
+       Since both tracking transmitters were in the payload bay behind
+       the nose cone, and we were eventually able to recover that portion 
+       of the rocket, it is possible that if the deployment bag were tethered
+       to the main that we might have recovered the remainder of the rocket.
+      </p><p>
+       If the rocket is recovered and able to fly again, the two changes I
+       would like to make are to tether the deployment bag to the apex of the
+       main, and to move from 2-56 nylon screws to 4-40 nylon screws for the
+       main deployment shear pins, ensuring the holes through the airframe
+       are a loose enough fit to avoid stresses on the pins during boost.  I
+       have no way to know what happened for sure, but believe this might 
+       solve the assumed problem of main deployment at apogee.
+      </p><p>
+       All in all, the design and build process was educational, and a lot
+       of fun!  I'm looking forward to fabricating more custom parts using
+       carbon fiber and vacuum bagging in the future.  
+       The beautiful boost and obvious survival of the rocket airframe
+       through the expected mach transitions confirms my design and 
+       construction skills are adequate to attain an L3 cert.  
+       While I hope to recover the remainder of YikStik someday, I won't 
+       waste any time before trying again with a new airframe!
+      </p><p>
+       [update]  We have learned that one of the altimeters used in this 
+       flight, the Missile Works miniRRC2, was subject to a fault in 
+       firmware that could cause premature ejection of the main
+       in flights above 10k feet.  Thus, it now seems even more likely
+       that we sustained an apogee ejection of the main, but that it
+       may well have been through no fault of the rocket's design,
+       construction, or preparation.  Frustrating!
+      </p></div></div></body></html>