updating for aj
[web/gag.com] / rockets / airframes / Goblin10 / index.html
index d4731417af7c920ec3e409a706dfe648ed3f96ff..3bec14f2f8d28ffda5f760391b61eb0a42645e92 100644 (file)
@@ -1,10 +1,10 @@
-<html><head><meta http-equiv="Content-Type" content="text/html; charset=ISO-8859-1"><title>Goblin 10</title><meta name="generator" content="DocBook XSL Stylesheets V1.73.2"></head><body bgcolor="white" text="black" link="#0000FF" vlink="#840084" alink="#0000FF"><div class="book" lang="en"><div class="titlepage"><div><div><h1 class="title"><a name="id2481338"></a>Goblin 10</h1></div><div><h2 class="subtitle">A NAR L3 Certification Rocket</h2></div><div><div class="author"><h3 class="author"><span class="firstname">Bdale</span> <span class="surname">Garbee</span></h3></div></div><div><p class="copyright">Copyright © 2008 Bdale Garbee</p></div><div><div class="legalnotice"><a name="id2736747"></a><p>
+<html><head><meta http-equiv="Content-Type" content="text/html; charset=ISO-8859-1"><title>Goblin 10</title><meta name="generator" content="DocBook XSL Stylesheets V1.78.1"></head><body bgcolor="white" text="black" link="#0000FF" vlink="#840084" alink="#0000FF"><div class="book"><div class="titlepage"><div><div><h1 class="title"><a name="idm15495832"></a>Goblin 10</h1></div><div><h2 class="subtitle">A NAR L3 Certification Rocket</h2></div><div><div class="author"><h3 class="author"><span class="firstname">Bdale</span> <span class="surname">Garbee</span></h3></div></div><div><p class="copyright">Copyright © 2008 Bdale Garbee</p></div><div><div class="legalnotice"><a name="idp109064"></a><p>
         This document is released under the terms of the 
         <a class="ulink" href="http://creativecommons.org/licenses/by-sa/3.0/" target="_top">
           Creative Commons ShareAlike 3.0
         </a>
         license.
-      </p></div></div><div><div class="revhistory"><table border="1" width="100%" summary="Revision history"><tr><th align="left" valign="top" colspan="2"><b>Revision History</b></th></tr><tr><td align="left">Revision 1.0</td><td align="left">15 November 2008</td></tr><tr><td align="left" colspan="2">Successful certification flight at Hudson Ranch</td></tr><tr><td align="left">Revision 0.2</td><td align="left">28 October 2008</td></tr><tr><td align="left" colspan="2">Revising during flight to DC</td></tr><tr><td align="left">Revision 0.1</td><td align="left">23 October 2008</td></tr><tr><td align="left" colspan="2">Initial content, derived from YikStik</td></tr></table></div></div></div><hr></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="chapter"><a href="#id2744045">1. Introduction</a></span></dt><dt><span class="chapter"><a href="#id2749934">2. Design</a></span></dt><dd><dl><dt><span class="section"><a href="#id2759790">Overview</a></span></dt><dt><span class="section"><a href="#id2737277">Rocksim File</a></span></dt><dt><span class="section"><a href="#id2763689">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#id2744686">Motor Retention</a></span></dt><dt><span class="section"><a href="#id2754969">Nose Cone Electronics Bay</a></span></dt><dt><span class="section"><a href="#id2733689">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#id2763384">Avionics</a></span></dt><dt><span class="section"><a href="#id2740504">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#id2748086">Expected Performance</a></span></dt><dt><span class="section"><a href="#id2767164">Recovery System</a></span></dt></dl></dd></dl></dd><dt><span class="chapter"><a href="#id2768933">3. Construction Details</a></span></dt><dd><dl><dt><span class="section"><a href="#id2749141">Airframe</a></span></dt><dt><span class="section"><a href="#id2754017">Nose Cone</a></span></dt><dt><span class="section"><a href="#id2771414">Avionics Bay</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2745741">4. Recovery Systems Package</a></span></dt><dd><dl><dt><span class="section"><a href="#id2740673">Recovery System Description</a></span></dt><dt><span class="section"><a href="#id2752914">Recovery Initiation Control Components</a></span></dt></dl></dd><dt><span class="chapter"><a href="#id2748101">5.  Checklists </a></span></dt><dt><span class="chapter"><a href="#id2750187">6. Flight Summary</a></span></dt><dt><span class="chapter"><a href="#id2764884">7. Analysis and Conclusions</a></span></dt></dl></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2744045"></a>Chapter 1. Introduction</h2></div></div></div><p>
+      </p></div></div><div><div class="revhistory"><table style="border-style:solid; width:100%;" summary="Revision History"><tr><th align="left" valign="top" colspan="2"><b>Revision History</b></th></tr><tr><td align="left">Revision 1.0</td><td align="left">15 November 2008</td></tr><tr><td align="left" colspan="2">Successful certification flight at Hudson Ranch</td></tr><tr><td align="left">Revision 0.2</td><td align="left">28 October 2008</td></tr><tr><td align="left" colspan="2">Revising during flight to DC</td></tr><tr><td align="left">Revision 0.1</td><td align="left">23 October 2008</td></tr><tr><td align="left" colspan="2">Initial content, derived from YikStik</td></tr></table></div></div></div><hr></div><div class="toc"><p><b>Table of Contents</b></p><dl class="toc"><dt><span class="chapter"><a href="#idp112680">1. Introduction</a></span></dt><dt><span class="chapter"><a href="#idp2161264">2. Design</a></span></dt><dd><dl><dt><span class="section"><a href="#idp1850344">Overview</a></span></dt><dt><span class="section"><a href="#idp2704224">Rocksim File</a></span></dt><dt><span class="section"><a href="#idp2161528">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#idp2305928">Motor Retention</a></span></dt><dt><span class="section"><a href="#idp2452064">Nose Cone Electronics Bay</a></span></dt><dt><span class="section"><a href="#idp2439640">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#idp2461808">Avionics</a></span></dt><dt><span class="section"><a href="#idp3312136">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#idp2033792">Expected Performance</a></span></dt><dt><span class="section"><a href="#idp3384200">Recovery System</a></span></dt></dl></dd></dl></dd><dt><span class="chapter"><a href="#idp1515616">3. Construction Details</a></span></dt><dd><dl><dt><span class="section"><a href="#idp2928992">Airframe</a></span></dt><dt><span class="section"><a href="#idp1978904">Nose Cone</a></span></dt><dt><span class="section"><a href="#idp47048">Avionics Bay</a></span></dt></dl></dd><dt><span class="chapter"><a href="#idp48792">4. Recovery Systems Package</a></span></dt><dd><dl><dt><span class="section"><a href="#idp49112">Recovery System Description</a></span></dt><dt><span class="section"><a href="#idp52136">Recovery Initiation Control Components</a></span></dt></dl></dd><dt><span class="chapter"><a href="#idp749288">5.  Checklists </a></span></dt><dt><span class="chapter"><a href="#idp201568">6. Flight Summary</a></span></dt><dt><span class="chapter"><a href="#idp58192">7. Analysis and Conclusions</a></span></dt></dl></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp112680"></a>Chapter 1. Introduction</h1></div></div></div><p>
       This is a rocket I'm building for my second attempt at a NAR Level 3 
       certification flight.  It's basically a Polecat Aerospace Goblin 10 kit
       augmented with an additional electronics bay in the nose cone, some
@@ -19,7 +19,7 @@
       NCR launch sites under their standing waivers.
       The smallest reasonable motor for this rocket would be a Cesaroni
       K445 or equivalent, which would yield an apogee of about 2300 feet.
-    </p></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2749934"></a>Chapter 2. Design</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2759790">Overview</a></span></dt><dt><span class="section"><a href="#id2737277">Rocksim File</a></span></dt><dt><span class="section"><a href="#id2763689">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#id2744686">Motor Retention</a></span></dt><dt><span class="section"><a href="#id2754969">Nose Cone Electronics Bay</a></span></dt><dt><span class="section"><a href="#id2733689">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#id2763384">Avionics</a></span></dt><dt><span class="section"><a href="#id2740504">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#id2748086">Expected Performance</a></span></dt><dt><span class="section"><a href="#id2767164">Recovery System</a></span></dt></dl></dd></dl></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2759790"></a>Overview</h2></div></div></div><p>
+    </p></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp2161264"></a>Chapter 2. Design</h1></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl class="toc"><dt><span class="section"><a href="#idp1850344">Overview</a></span></dt><dt><span class="section"><a href="#idp2704224">Rocksim File</a></span></dt><dt><span class="section"><a href="#idp2161528">Drawing from Rocksim</a></span></dt><dt><span class="section"><a href="#idp2305928">Motor Retention</a></span></dt><dt><span class="section"><a href="#idp2452064">Nose Cone Electronics Bay</a></span></dt><dt><span class="section"><a href="#idp2439640">Electronics</a></span></dt><dd><dl><dt><span class="section"><a href="#idp2461808">Avionics</a></span></dt><dt><span class="section"><a href="#idp3312136">Stability Evaluation</a></span></dt><dt><span class="section"><a href="#idp2033792">Expected Performance</a></span></dt><dt><span class="section"><a href="#idp3384200">Recovery System</a></span></dt></dl></dd></dl></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp1850344"></a>Overview</h2></div></div></div><p>
         The Goblin 10 kit is a simple "four fins and a nose cone" rocket 
        that is short and squat, with a 98mm motor mount.  
        It supports dual-deploy by
         centering rings, accessed by a side hatch.  An additional payload bay
         will be built inside the nose cone to carry experimental altimeters,
         a tracking beacon, and possibly a GPS position reporting system.
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2737277"></a>Rocksim File</h2></div></div></div>
-      This is the current working design in Rocksim format:
-      <a class="ulink" href="Polecat_Goblin_10.rkt" target="_top"> Polecat_Goblin_10.rkt </a></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2763689"></a>Drawing from Rocksim</h2></div></div></div><span class="inlinemediaobject"><img src="Polecat_Goblin_10.jpg" height="450"></span></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2744686"></a>Motor Retention</h2></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2704224"></a>Rocksim File</h2></div></div></div>
+      This is the original working design in Rocksim format, 
+      <a class="ulink" href="Polecat_Goblin_10.rkt" target="_top"> Polecat_Goblin_10.rkt </a>,
+      and this is the final design file as the airframe existed before
+      burning up with our house in June of 2013:
+      <a class="ulink" href="Polecat_Goblin_10+MonkeyBay+ARRD.rkt" target="_top"> Polecat_Goblin_10+MonkeyBay+ARRD.rkt </a></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2161528"></a>Drawing from Rocksim</h2></div></div></div><span class="inlinemediaobject"><img src="Polecat_Goblin_10.jpg" height="450"></span></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2305928"></a>Motor Retention</h2></div></div></div><p>
         I will include 8-24 T-nuts in the aft centering ring spaced to allow
         the use of an Aeropack 98mm retainer and associated 75mm adapter.  
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2754969"></a>Nose Cone Electronics Bay</h2></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2452064"></a>Nose Cone Electronics Bay</h2></div></div></div><p>
         Instead of using the supplied nose cone bulkhead, I intend to cut a
         custom one that would support installing a length of 98mm motor mount
         from the tip of the nose to the bulkhead.  With a plate cut to cover
         the aft end of the airframe tube, this would form an electronics bay
         capable of holding a beacon transmitter, GPS system, or other custom
         electronics.
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2733689"></a>Electronics</h2></div></div></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2763384"></a>Avionics</h3></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2439640"></a>Electronics</h2></div></div></div><div class="section"><div class="titlepage"><div><div><h3 class="title"><a name="idp2461808"></a>Avionics</h3></div></div></div><p>
           The recovery system will feature dual redundant barometric altimeters
           in the main avionics bay between the two forward motor mount 
           centering rings.
@@ -54,7 +57,7 @@
           A third rotary switch will be used as a SAFE/ARM switch configured 
           to interrupt connectivity to all ejection charges in accordance with
           NAR certification requirements.
-        </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2740504"></a>Stability Evaluation</h3></div></div></div><p>
+        </p></div><div class="section"><div class="titlepage"><div><div><h3 class="title"><a name="idp3312136"></a>Stability Evaluation</h3></div></div></div><p>
           The Goblin 10 kit designers indicate
           that the rocket is unconditionally stable with all motors that fit
           the motor mount geometry.  Since we're adding mass at both ends, by
          I also note that the simulated margin of stability
          in my as-built configuration is fairly close to the margin of
          stability of the as-designed model.  
-        </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2748086"></a>Expected Performance</h3></div></div></div><p>
+        </p></div><div class="section"><div class="titlepage"><div><div><h3 class="title"><a name="idp2033792"></a>Expected Performance</h3></div></div></div><p>
           The Aerotech M1297W reload should carry this vehicle to just under
           7000 feet AGL from Colorado Front Range launch sites.  It 
           should reach just over 2 miles on a Cesaroni M795 moon burner 
           or equivalent.
-        </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h3 class="title"><a name="id2767164"></a>Recovery System</h3></div></div></div><p>
+        </p></div><div class="section"><div class="titlepage"><div><div><h3 class="title"><a name="idp3384200"></a>Recovery System</h3></div></div></div><p>
           The recovery system will use dual redundant barometric altimeters 
          firing 4F black powder charges using commercial e-matches. 
           At apogee, a drogue chute will deploy with separation of the nose 
         </p><p>
           The recovery system attachment points will all use 1/4 inch u-bolts 
           with nuts, washers, and backing plates through bulkheads.
-        </p></div></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2768933"></a>Chapter 3. Construction Details</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2749141">Airframe</a></span></dt><dt><span class="section"><a href="#id2754017">Nose Cone</a></span></dt><dt><span class="section"><a href="#id2771414">Avionics Bay</a></span></dt></dl></div><p>
+        </p></div></div></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp1515616"></a>Chapter 3. Construction Details</h1></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl class="toc"><dt><span class="section"><a href="#idp2928992">Airframe</a></span></dt><dt><span class="section"><a href="#idp1978904">Nose Cone</a></span></dt><dt><span class="section"><a href="#idp47048">Avionics Bay</a></span></dt></dl></div><p>
         I have collected all of my
         <a class="ulink" href="http://gallery.gag.com/rockets/goblin10" target="_top">
         build photos
         </a>
         in one place, they may show better than I can explain how various
         aspects of the Goblin went together.
-      </p><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2749141"></a>Airframe</h2></div></div></div><p>
+      </p><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp2928992"></a>Airframe</h2></div></div></div><p>
         The airframe tubing provided in the Polecat kit is thick cardboard tube
         with a thin exterior fiberglass wrap.  To increase airframe strength, 
        and particularly to prevent zippers, additional reinforcement seemed
        curing by an inflatable child's bounce toy inside a plastic garbage
        bag.  The result is a substantially strengthened tube, with carbon
        fiber lining from the leading edge back past the first centering ring.
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2754017"></a>Nose Cone</h2></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp1978904"></a>Nose Cone</h2></div></div></div><p>
        The provided nose cone bulkhead was replaced by a custom centering
        ring cut from 3/8 inch birch plywood.  The ring's outer diameter was
        adjusted put place the ring approximately an inch forward of the end
        the piece of airframe tubing.  After the epoxies cured, a rotary tool
        was used to cut the airframe tubing off flush with the aft surface of
        the centering ring.
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2771414"></a>Avionics Bay</h2></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp47048"></a>Avionics Bay</h2></div></div></div><p>
        The avionics bay walls were installed approximately 90 degrees apart
        prior to installation of the motor mount assembly in the airframe.
        The airframe wall was marked for a 3.5 x 6.5" access hatch centered
        A suitably sized avionics sled should be possible to install and remove
        through the avionics bay hatch allowing for possible future experiments
        with alternative avionics.
-      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2745741"></a>Chapter 4. Recovery Systems Package</h2></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl><dt><span class="section"><a href="#id2740673">Recovery System Description</a></span></dt><dt><span class="section"><a href="#id2752914">Recovery Initiation Control Components</a></span></dt></dl></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2740673"></a>Recovery System Description</h2></div></div></div><p>
+      </p></div></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp48792"></a>Chapter 4. Recovery Systems Package</h1></div></div></div><div class="toc"><p><b>Table of Contents</b></p><dl class="toc"><dt><span class="section"><a href="#idp49112">Recovery System Description</a></span></dt><dt><span class="section"><a href="#idp52136">Recovery Initiation Control Components</a></span></dt></dl></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp49112"></a>Recovery System Description</h2></div></div></div><p>
         This rocket uses dual deployment.  
       </p><p>
         The apogee event separates the nose cone from the
        chute apex, with a smaller drogue chute deployed to pull off the bag
        and cleanly deploy the main.  The primary motivation for this is to
        prevent the main chute shrouds from tangling during ejection.
-      </p></div><div class="section" lang="en"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="id2752914"></a>Recovery Initiation Control Components</h2></div></div></div><p>
+      </p></div><div class="section"><div class="titlepage"><div><div><h2 class="title" style="clear: both"><a name="idp52136"></a>Recovery Initiation Control Components</h2></div></div></div><p>
         The main avionics bay between the forward two centering rings is 
         populated with two commercial altimeters, a PerfectFlite MAWD 
         and a Missile Works miniRRC2.  
        With a 10 foot Team Vatsaas design parachute and our
        anticipated build weight, the descent rate under main
        should be just over 20 feet per second.
-      </p></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2748101"></a>Chapter 5.  Checklists </h2></div></div></div><div class="orderedlist"><ol type="1"><li
+      </p></div></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp749288"></a>Chapter 5.  Checklists </h1></div></div></div><div class="orderedlist"><ol class="orderedlist" type="1"><li class="listitem"
         Planning
-        <div class="orderedlist"><ol type="1"><li>
+        <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>1.1.</td><td>
             Pick a club launch with suitable waiver and facilities to 
             support flight.
-          </li><li>
+          </td></tr><tr><td>1.2.</td><td>
             Confirm L3CC member(s) available to attend selected launch.
-          </li><li>
+          </td></tr><tr><td>1.3.</td><td>
             Confirm that required loaner motor hardware will be available at launch.
-          </li><li>
+          </td></tr><tr><td>1.4.</td><td>
             Notify launch sponsor (club president) of intended flight.
-          </li><li>
+          </td></tr><tr><td>1.5.</td><td>
             Notify interested friends of intended flight.
-          </li><li>
+          </td></tr><tr><td>1.6.</td><td>
             Perform final pre-flight simulation with as-built masses, etc.
-          </li><li>
+          </td></tr><tr><td>1.7.</td><td>
             Gather consummables and tools required to support flight
-            <div class="orderedlist"><ol type="1"><li>
+            <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>1.7.1.</td><td>
                 fresh 9V batteries
-              </li><li>
+              </td></tr><tr><td>1.7.2.</td><td>
                 black powder 
-              </li><li>
+              </td></tr><tr><td>1.7.3.</td><td>
                 e-matches 
-              </li><li>
+              </td></tr><tr><td>1.7.4.</td><td>
                 motor retainer and adapter parts
-              </li><li>
+              </td></tr><tr><td>1.7.5.</td><td>
                 small nylon wire ties
-              </li><li>
+              </td></tr><tr><td>1.7.6.</td><td>
                 cellulose wadding material
-              </li><li>
+              </td></tr><tr><td>1.7.7.</td><td>
                 masking tape
-              </li><li>
+              </td></tr><tr><td>1.7.8.</td><td>
                 screwdriver for phillips-head avionics bay screws
-              </li><li>
+              </td></tr><tr><td>1.7.9.</td><td>
                 small straight-blade screwdriver for power switches
-              </li><li>
+              </td></tr><tr><td>1.7.10.</td><td>
                 motor reload kit (or arrangements to procure at launch)
-              </li><li>
+              </td></tr><tr><td>1.7.11.</td><td>
                 high temperature grease
-              </li><li>
+              </td></tr><tr><td>1.7.12.</td><td>
                 long small diameter dowels for igniter insertion
-              </li></ol></div></li></ol></div></li><li
+              </td></tr></tbody></table></div></td></tr></tbody></table></div></li><li class="listitem"
         Before Leaving Home 
-        <div class="orderedlist"><ol type="1"><li>
+        <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>2.1.</td><td>
             program altimeters for suitable mach delay and recovery deployment
-            <div class="itemizedlist"><ul type="disc"><li>
+            <div class="itemizedlist"><ul class="itemizedlist" style="list-style-type: disc; "><li class="listitem">
                 MAWD
-                <div class="itemizedlist"><ul type="circle"><li>
+                <div class="itemizedlist"><ul class="itemizedlist" style="list-style-type: circle; "><li class="listitem">
                     no mach delay
-                  </li><li>
+                  </li><li class="listitem">
                     1300 foot main deploy
-                  </li></ul></div></li><li>
+                  </li></ul></div></li><li class="listitem">
                 
                 miniRRC2
-                <div class="itemizedlist"><ul type="circle"><li>
+                <div class="itemizedlist"><ul class="itemizedlist" style="list-style-type: circle; "><li class="listitem">
                     no mach delay
-                  </li><li>
+                  </li><li class="listitem">
                     1000 foot main deploy
-                  </li><li>
+                  </li><li class="listitem">
                     2 seconds apogee delay
-                  </li><li>
+                  </li><li class="listitem">
                     no main delay
-                  </li><li>
+                  </li><li class="listitem">
                     dual deploy
-                  </li><li>
+                  </li><li class="listitem">
                     ops mode 16 (default)
-                  </li></ul></div></li></ul></div></li><li>
+                  </li></ul></div></li></ul></div></td></tr><tr><td>2.2.</td><td>
             assemble all recovery system components and ensure everything fits
-          </li><li>
+          </td></tr><tr><td>2.3.</td><td>
             confirm wiring and operation of altimeter power and safe/arm 
             switches
-          </li><li>
+          </td></tr><tr><td>2.4.</td><td>
             Ground test recovery system to confirm suitable black powder 
             charge sizing
-          </li></ol></div></li><li>
+          </td></tr></tbody></table></div></li><li class="listitem">
         Pre-Flight
-        <div class="orderedlist"><ol type="1"><li>
+        <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>3.1.</td><td>
             confirm payload batteries in good condition, bay loaded, 
             power switch works
-          </li><li>
+          </td></tr><tr><td>3.2.</td><td>
             confirm reception of signals from transmitter(s)
-          </li><li>
+          </td></tr><tr><td>3.3.</td><td>
             install fresh 9V batteries for altimeters on avionics bay sled
-          </li><li>
+          </td></tr><tr><td>3.4.</td><td>
             inspect altimeters and associated avionics bay wiring for 
             visible faults
-          </li><li>
+          </td></tr><tr><td>3.5.</td><td>
             close up avionics bay 
-          </li><li>
+          </td></tr><tr><td>3.6.</td><td>
             build and install BP charges
-            <div class="orderedlist"><ol type="1"><li>
+            <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>3.6.1.</td><td>
                 Drogue Primary Charge - 3.5 grams 4F BP
-              </li><li>
+              </td></tr><tr><td>3.6.2.</td><td>
                 Drogue Backup Charge - 4.0 grams 4F BP
-              </li><li>
+              </td></tr><tr><td>3.6.3.</td><td>
                 Main Primary Charge - 1.5 grams 4F BP
-              </li><li>
+              </td></tr><tr><td>3.6.4.</td><td>
                 Main Backup Charge - 2.0 grams 4F BP
-              </li></ol></div></li><li>
+              </td></tr></tbody></table></div></td></tr><tr><td>3.7.</td><td>
             fold main chute, connect recovery harness to piston and airframe,
             install in MMT and tape paper over the front end
-          </li><li>
+          </td></tr><tr><td>3.8.</td><td>
             fold drogue chute into a kevlar pad, connect recovery harness to 
             nose cone and airframe, install in airframe
-          </li><li>
+          </td></tr><tr><td>3.9.</td><td>
             power up payload using switch on base plate in nose cone, then
             install nose cone, using masking tape to adjust fit as required
-          </li><li>
+          </td></tr><tr><td>3.10.</td><td>
             safely power up altimeters, operate safe/arm switch, 
             and confirm e-match continuity
-          </li><li>
+          </td></tr><tr><td>3.11.</td><td>
             safe and power-down the altimeters
-          </li><li>
+          </td></tr><tr><td>3.12.</td><td>
             load motor per manufacturer instructions
-          </li><li>
+          </td></tr><tr><td>3.13.</td><td>
             install motor in motor mount
-          </li><li>
+          </td></tr><tr><td>3.14.</td><td>
             install motor retention
-          </li><li>
+          </td></tr><tr><td>3.15.</td><td>
             prepare igniter using e-matches, 1/8 inch dowel
-          </li><li>
+          </td></tr><tr><td>3.16.</td><td>
             confirm all screws in place, avionics off and safe
-          </li><li>
+          </td></tr><tr><td>3.17.</td><td>
             fill out a launch card
-          </li><li>
+          </td></tr><tr><td>3.18.</td><td>
             notify RSO/LCO of readiness for inspection and launch, obtain 
             a rail assignment and permission to move rocket to launch pad for 
             final prep
-          </li><li>
+          </td></tr><tr><td>3.19.</td><td>
             coordinate readiness with support team members, photographers, 
             observers
-          </li></ol></div></li><li>
+          </td></tr></tbody></table></div></li><li class="listitem">
         Final Prep
-        <div class="orderedlist"><ol type="1"><li>
+        <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>4.1.</td><td>
             move rocket to launch area
-          </li><li>
+          </td></tr><tr><td>4.2.</td><td>
             clean and lubricate launch rail if necessary
-          </li><li>
+          </td></tr><tr><td>4.3.</td><td>
             confirm reception of signals from payload transmitter(s)
-          </li><li>
+          </td></tr><tr><td>4.4.</td><td>
             mount rocket on launch rail, rotate to vertical
-          </li><li>
+          </td></tr><tr><td>4.5.</td><td>
             power up primary altimeter, confirm expected beep pattern
-          </li><li>
+          </td></tr><tr><td>4.6.</td><td>
             power up backup altimeter, confirm expected beep pattern
-          </li><li>
+          </td></tr><tr><td>4.7.</td><td>
             arm ejection charges
-          </li><li>
+          </td></tr><tr><td>4.8.</td><td>
             confirm altimeters both giving expected beep patterns for 
             igniter continuity
-          </li><li>
+          </td></tr><tr><td>4.9.</td><td>
             install igniter and connect to launch control system
-          </li><li>
+          </td></tr><tr><td>4.10.</td><td>
             capture GPS waypoint for rail location
-          </li><li>
+          </td></tr><tr><td>4.11.</td><td>
             smile for the cameras, make sure we have enough "foil Murphy!" 
             shots taken
-          </li><li>
+          </td></tr><tr><td>4.12.</td><td>
             retreat to safe area behind LCO
-          </li><li>
+          </td></tr><tr><td>4.13.</td><td>
             confirm continued reception of transmitter signal(s) from 
             payload bay
-          </li><li>
+          </td></tr><tr><td>4.14.</td><td>
             confirm photographers and observers are ready and know what to 
             expect
-          </li><li>
+          </td></tr><tr><td>4.15.</td><td>
             make sure binoculars and backpack with water and recovery tools 
             are at hand
-          </li><li>
+          </td></tr><tr><td>4.16.</td><td>
             tell RSO and LCO we're ready to launch
-          </li><li>
+          </td></tr><tr><td>4.17.</td><td>
             try to relax and enjoy watching the flight!
-          </li></ol></div></li><li>
+          </td></tr></tbody></table></div></li><li class="listitem">
         Recovery
-        <div class="orderedlist"><ol type="1"><li>
+        <div class="orderedlist"><table border="0" class="orderedlist"><colgroup><col align="left" valign="top"><col></colgroup><tbody><tr><td>5.1.</td><td>
             track rocket to landing site
-          </li><li>
+          </td></tr><tr><td>5.2.</td><td>
             capture GPS waypoint of landing site, take lots of photos
-          </li><li>
+          </td></tr><tr><td>5.3.</td><td>
             note any damage
-          </li><li>
+          </td></tr><tr><td>5.4.</td><td>
             gather up and roughly re-pack recovery system for return to 
             flight line
-          </li><li>
+          </td></tr><tr><td>5.5.</td><td>
             bring the rocket to observers for post-flight inspection
-          </li></ol></div></li></ol></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2750187"></a>Chapter 6. Flight Summary</h2></div></div></div><p>
+          </td></tr></tbody></table></div></li></ol></div></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp201568"></a>Chapter 6. Flight Summary</h1></div></div></div><p>
        A successful level 3 certification flight occurred on 15 November 2008
        at the SCORE Hudson Ranch launch facility.  The motor was an Aerotech
        M1297W provided by Tim Thomas of Giant Leap Motors, the igniter was
        The miniRRC2 altimeter reported 5949 feet apogee, 980 feet per second
        max velocity, and 19 seconds to apogee.  The MAWD reported 5953 feet
        apogee.
-      </p><div class="itemizedlist"><ul type="disc"><li><a class="ulink" href="http://picasaweb.google.com/jamesr2/StealeyMemorialLaunchSiteHudsonRanch" target="_top">
+      </p><div class="itemizedlist"><ul class="itemizedlist" style="list-style-type: disc; "><li class="listitem"><a class="ulink" href="http://picasaweb.google.com/jamesr2/StealeyMemorialLaunchSiteHudsonRanch" target="_top">
        Photos of the launch taken by James Russell
-        </a></li><li><a class="ulink" href="http://cosrocs.org/all%20other%20videos/2008videos/11-15hudson/bdale_L3.mov" target="_top">
+        </a></li><li class="listitem"><a class="ulink" href="http://cosrocs.org/all%20other%20videos/2008videos/11-15hudson/bdale_L3.mov" target="_top">
        Video of the launch taken by Jeff Lane
-        </a></li><li><a class="ulink" href="http://www.youtube.com/watch?v=xaJnl89wfWU" target="_top">
+        </a></li><li class="listitem"><a class="ulink" href="http://www.youtube.com/watch?v=xaJnl89wfWU" target="_top">
        Video of the launch taken by Jason Unwin
-        </a></li></ul></div></div><div class="chapter" lang="en"><div class="titlepage"><div><div><h2 class="title"><a name="id2764884"></a>Chapter 7. Analysis and Conclusions</h2></div></div></div><p>
+        </a></li></ul></div></div><div class="chapter"><div class="titlepage"><div><div><h1 class="title"><a name="idp58192"></a>Chapter 7. Analysis and Conclusions</h1></div></div></div><p>
        The ascent was straighter than expected... very smooth during
        the motor burn, then a couple slow rolls during coast.  The two 
        altimeters agreed within 4 feet on the apogee.  The max
        profile from the MAWD shows that our actual descent rate was about
        32 feet per second.  There are three possible sources of error to 
        consider.  
-       </p><div class="orderedlist"><ol type="1"><li
+       </p><div class="orderedlist"><ol class="orderedlist" type="1"><li class="listitem"
                The first is descent mass.  Pre-flight calculations used
                25 pounds.  
                The actual flight weight was 25.2 pounds plus the burn-out
                In flight, it appeared the drogue supported the nose and the
                main supported the fin can with very little interaction between
                the two.
-         </li><li> 
+         </li><li class="listitem"
                Second, the dimensions given by Team Vatsaas' spreadsheet
                for the pattern grid seem small.  For a 10 foot chute, they
                suggest a grid size of 5 inches, which looks more like an 8.5
                foot finished chute size to me.
-         </li><li> 
+         </li><li class="listitem"
                Finally, the Cd in the spreadsheet is 1.5, which may be overly
                optimistic.
          </li></ol></div><p>
       </p><p>
        So, overall, this was a successful flight, but with three things to
        change before we fly the airframe again... 
-       </p><div class="orderedlist"><ol type="1"><li
+       </p><div class="orderedlist"><ol class="orderedlist" type="1"><li class="listitem"
                the main chute may be too small
-         </li><li> 
+         </li><li class="listitem"
                switch to a piston to cap the main chute bay
-         </li><li> 
+         </li><li class="listitem"
                beef up the battery retention on the avionics sled
          </li></ol></div><p>
       </p></div></div></body></html>