@@ -14,6 +14,11 @@ survived.  So we quickly decided to re-build on the same property, and hope
 the new house will be ready by late summer 2014.  In the meantime, we're 
 living in an apartment in nearby Colorado Springs.
 
+If you want to hear more about our experience, feel free to view the video 
+of Bdale's 
+[talk at Linux Conf Australia](https://www.youtube.com/watch?v=lJcnllq3VYY)
+about the fire and some of the lessons we learned.
+
 ###Helping###
 
 For those of you who have asked how you can help us restore and rebuild, 
@@ -48,6 +53,20 @@ were directly fighting the fire on and around our property:
 
 ### Journal ###
 
+* 2014 October 3<br>Finished cleaning up the apartment and associated garages,
+       and turned in those keys.
+* 2014 September 27<br>Began to move out of the apartment and in to our new 
+       house!  We're home! 
+* 2014 September 25<br>Our builder passed his final inspection with regional
+       building!  A list of final (mostly cosmetic) details to finish up, 
+       then we can move in.
+* 2014 July 31<br>Hardwood floors are in, tile floors are in process, finish
+       electrical has started, trim material in the process of being stained.
+* 2014 June 10<br>Rough-in inspections for plumbing, electrical, HVAC, and
+       so forth all completed... on to insulation!
+* 2014.May 8<br>Exterior doors and windows in, roofing begun, 
+       duct work underway.
+* 2014.April 26<br>Concrete slabs for basement and garage floor poured.
 * 2014 April 9<br>Roof trusses installed.
 * 2014 March 25<br>Framing started.
 * 2014 March 14<br>Concrete poured for the foundation / basement walls.