final inspection passed
[web/gag.com] / blackforestfire.mdwn
index 6623d37752a81f3617bdb3180d0e69b531f27836..79513eb4ba969db86b68e350da79ed7aa1061f26 100644 (file)
@@ -53,6 +53,9 @@ were directly fighting the fire on and around our property:
 
 ### Journal ###
 
+* 2014 September 25<br>Our builder passed his final inspection with regional
+       building!  A list of final (mostly cosmetic) details to finish up, 
+       then we can move in.
 * 2014 July 31<br>Hardwood floors are in, tile floors are in process, finish
        electrical has started, trim material in the process of being stained.
 * 2014 June 10<br>Rough-in inspections for plumbing, electrical, HVAC, and