hw/telenano
7 years agomove to preferred parts, start working on even smaller v0.3 design master
Bdale Garbee [Tue, 24 Jan 2017 19:25:13 +0000 (12:25 -0700)]
move to preferred parts, start working on even smaller v0.3 design

11 years agomove to partslistgag
Bdale Garbee [Tue, 11 Dec 2012 17:09:54 +0000 (10:09 -0700)]
move to partslistgag

13 years agoadd silkscreen rectangle for serial number fab-v0.2
Bdale Garbee [Thu, 21 Apr 2011 22:45:52 +0000 (16:45 -0600)]
add silkscreen rectangle for serial number

13 years agoupdate silkscreen copyright year
Bdale Garbee [Thu, 21 Apr 2011 22:44:27 +0000 (16:44 -0600)]
update silkscreen copyright year

13 years agochange debug header to 50 mil pitch
Bdale Garbee [Tue, 19 Apr 2011 07:54:13 +0000 (01:54 -0600)]
change debug header to 50 mil pitch

13 years agoshove some copper around to improve ground plane
Bdale Garbee [Tue, 29 Mar 2011 23:38:26 +0000 (17:38 -0600)]
shove some copper around to improve ground plane

13 years agoadd two holes for wires to a power switch
Bdale Garbee [Tue, 29 Mar 2011 23:17:28 +0000 (17:17 -0600)]
add two holes for wires to a power switch

13 years agochange name of LED to dualLED
Bdale Garbee [Tue, 29 Mar 2011 22:07:52 +0000 (16:07 -0600)]
change name of LED to dualLED

13 years agomake sure all silk elements are within board outline fab-v0.1
Bdale Garbee [Tue, 23 Nov 2010 06:16:59 +0000 (23:16 -0700)]
make sure all silk elements are within board outline

13 years agoadd outline layer
Bdale Garbee [Tue, 23 Nov 2010 05:50:54 +0000 (22:50 -0700)]
add outline layer

13 years agolose C9 since it's redundant on such a tight board
Bdale Garbee [Thu, 18 Nov 2010 23:16:16 +0000 (16:16 -0700)]
lose C9 since it's redundant on such a tight board

13 years agoupdate to reflect footprint name change
Bdale Garbee [Thu, 18 Nov 2010 23:00:45 +0000 (16:00 -0700)]
update to reflect footprint name change

13 years agoadd targets for automating outputs
Bdale Garbee [Thu, 11 Nov 2010 10:25:32 +0000 (03:25 -0700)]
add targets for automating outputs

13 years agofix mask clearance issue identified by freedfm
Bdale Garbee [Thu, 11 Nov 2010 10:18:52 +0000 (03:18 -0700)]
fix mask clearance issue identified by freedfm

13 years agoadd atributes
Bdale Garbee [Thu, 11 Nov 2010 08:38:22 +0000 (01:38 -0700)]
add atributes

13 years agoupdate to reflect desired reset circuit component values
Bdale Garbee [Thu, 11 Nov 2010 03:41:12 +0000 (20:41 -0700)]
update to reflect desired reset circuit component values

13 years agoreset circuit passive values changed to match TeleMetrum v0.1, and footprint
Bdale Garbee [Wed, 10 Nov 2010 23:45:04 +0000 (16:45 -0700)]
reset circuit passive values changed to match TeleMetrum v0.1, and footprint
for the debug connector fixed to have origin in pin 1

13 years agoa couple more copper tweaks to clean up overlap "jaggies"
Bdale Garbee [Wed, 10 Nov 2010 17:59:27 +0000 (10:59 -0700)]
a couple more copper tweaks to clean up overlap "jaggies"

13 years agolots of copper tweaking
Bdale Garbee [Fri, 5 Nov 2010 23:38:22 +0000 (17:38 -0600)]
lots of copper tweaking

13 years agoclean up ground plane a bit .. fewer thermals on vias, etc
Bdale Garbee [Fri, 5 Nov 2010 17:13:00 +0000 (11:13 -0600)]
clean up ground plane a bit .. fewer thermals on vias, etc

13 years agoenabling outline layer causes bogus drc errors, so leave it off
Bdale Garbee [Fri, 5 Nov 2010 04:48:36 +0000 (22:48 -0600)]
enabling outline layer causes bogus drc errors, so leave it off

13 years agoadd copyright symbol to font, update back side silk
Bdale Garbee [Thu, 4 Nov 2010 22:46:20 +0000 (16:46 -0600)]
add copyright symbol to font, update back side silk

13 years agopart number for better crystal
Bdale Garbee [Wed, 3 Nov 2010 20:15:21 +0000 (14:15 -0600)]
part number for better crystal

13 years agoadd an explicit outline layer
Bdale Garbee [Wed, 3 Nov 2010 20:10:14 +0000 (14:10 -0600)]
add an explicit outline layer

13 years agono drc errors, refdes turned off in the silkscreen
Bdale Garbee [Wed, 3 Nov 2010 20:03:40 +0000 (14:03 -0600)]
no drc errors, refdes turned off in the silkscreen

13 years agoadded mounting holes, cleaned up back-side silk (product name, etc)
Bdale Garbee [Wed, 3 Nov 2010 19:04:03 +0000 (13:04 -0600)]
added mounting holes, cleaned up back-side silk (product name, etc)

13 years agodown to desired board outline size
Bdale Garbee [Wed, 3 Nov 2010 18:31:33 +0000 (12:31 -0600)]
down to desired board outline size

13 years agobottom layer pulled back into new board boundary, silk delineation removed
Bdale Garbee [Wed, 3 Nov 2010 18:21:04 +0000 (12:21 -0600)]
bottom layer pulled back into new board boundary, silk delineation removed

13 years agofully routed
Bdale Garbee [Wed, 3 Nov 2010 18:19:56 +0000 (12:19 -0600)]
fully routed

13 years agowhoa! getting there!
Bdale Garbee [Wed, 3 Nov 2010 14:58:52 +0000 (08:58 -0600)]
whoa!  getting there!

13 years agorename for consistency with tele* structure
Bdale Garbee [Wed, 3 Nov 2010 13:10:21 +0000 (07:10 -0600)]
rename for consistency with tele* structure

13 years agoavoid 'pico' prefix as potentially confusing with the picoalt guy
Bdale Garbee [Wed, 3 Nov 2010 12:08:34 +0000 (06:08 -0600)]
avoid 'pico' prefix as potentially confusing with the picoalt guy

13 years agoplace new connector on layout
Bdale Garbee [Wed, 3 Nov 2010 05:41:54 +0000 (23:41 -0600)]
place new connector on layout

13 years agomove silk marker to 0.375, leaving 1.125 inches length to work in
Bdale Garbee [Wed, 3 Nov 2010 05:40:01 +0000 (23:40 -0600)]
move silk marker to 0.375, leaving 1.125 inches length to work in

13 years agochange to picoblade for debug connector
Bdale Garbee [Wed, 3 Nov 2010 05:38:30 +0000 (23:38 -0600)]
change to picoblade for debug connector

13 years agowhat I got done on the DEN->BOS flight to LPC 2010
Bdale Garbee [Tue, 2 Nov 2010 19:46:22 +0000 (13:46 -0600)]
what I got done on the DEN->BOS flight to LPC 2010

13 years agolots of progress on the layout
Bdale Garbee [Tue, 2 Nov 2010 19:14:40 +0000 (13:14 -0600)]
lots of progress on the layout

13 years agolose the mounting holes for now
Bdale Garbee [Mon, 3 May 2010 21:04:42 +0000 (15:04 -0600)]
lose the mounting holes for now

13 years agoone step closer
Bdale Garbee [Mon, 3 May 2010 20:55:11 +0000 (14:55 -0600)]
one step closer

13 years agoworking on plane polygons
Bdale Garbee [Mon, 3 May 2010 20:43:07 +0000 (14:43 -0600)]
working on plane polygons

13 years agoinitial work on stripping TeleMetrum down
Bdale Garbee [Mon, 3 May 2010 20:38:12 +0000 (14:38 -0600)]
initial work on stripping TeleMetrum down