[hw/telebt] / telebt.lht
2022-08-09 Bdale Garbeework in progress
2022-08-08 Bdale Garbeemove to latest 4 layer default template, enable on_ever...
2020-04-01 Bdale Garbeepush switch in from the pcb edge a bit to make sure...
2020-04-01 Bdale Garbeerotate LiPo connector for easier attachment of wire...
2020-03-14 Bdale Garbeemove battery connector to make room for battery, tweak...
2020-03-01 Bdale Garbeenew power switch installed .. route complete, drc clean
2020-03-01 Bdale Garbeemove stuff around in preparation for new power switch
2020-02-29 Bdale Garbeemove layout away from work area edges
2020-02-29 Bdale Garbeeunlock everything on layout
2020-02-29 Bdale Garbeeincrease size of work area
2020-02-03 Bdale Garbeeeverything except move to slide switch done
2020-02-03 Bdale Garbeemove to lepton-eda/pcb-rnd