From 1e3e07995877700e41655650dd8f43427ae105cd Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Fri, 14 Sep 2012 10:11:56 -0600 Subject: [PATCH 1/1] add more notes about TeleScience future --- TeleScience/index.mdwn | 14 +++++++++----- 1 file changed, 9 insertions(+), 5 deletions(-) diff --git a/TeleScience/index.mdwn b/TeleScience/index.mdwn index d435a60..26ada2e 100644 --- a/TeleScience/index.mdwn +++ b/TeleScience/index.mdwn @@ -68,9 +68,13 @@ but no prototypes have been built yet. and flown at LDRS 30 in early September 2011. Unfortunately, we experienced a mechanical failure in the airframe before going fast enough to get exciting data, but post-flight analysis suggested the TeleScience boards were working -fine up until "the incident". A replacement airframe is under construction -that we hope to fly at NCR's 2012 edition of Mile High Mayhem. +fine up until "the incident". A replacement airframe +[YikStik3](http://www.gag.com/rockets/airframes/YikStik3/) +flew successfully at Airfest 18 in September 2012. We appear to have good data +from the fin can, but not from the nose cone... more details once the data +analysis is complete. -The thermistor conditioning circuits in the current design are very tightly -coupled to the particular model of EPCOS thermistor that we chose for 2YikStik. -Before we could sell TeleScience, that needs to be addressed somehow. +The thermistor conditioning circuits in the v0.1 design are too tightly coupled +to the particular model of EPCOS thermistor that we chose for 2YikStik and +YikStik3. A major revision of the board is nearing prototype stage in Septmeber +2012, and will be further documented here soon. -- 2.30.2