From 08cccb526d3b957e7b82ceb4c0e932ce3cdfb624 Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Sat, 8 Aug 2009 09:58:35 -0600 Subject: [PATCH] built two more TM boards --- TeleMetrum/production.mdwn | 27 ++++++++++++++++++++++++--- 1 file changed, 24 insertions(+), 3 deletions(-) diff --git a/TeleMetrum/production.mdwn b/TeleMetrum/production.mdwn index f706f30..cf1732e 100644 --- a/TeleMetrum/production.mdwn +++ b/TeleMetrum/production.mdwn @@ -12,6 +12,10 @@ ground. R17 replaced with short circuit, R18 removed. Installed in Bdale's Vertical Assault. First unit to be flown on 19 April 2009, on a Cesaroni J335. +Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on +2009.07.18 with a MAWD as backup. The first dual-deploy flight with a TM +board in control of ejection charges! + ## sn 2 ## Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory @@ -26,7 +30,8 @@ ascent was pretty but the rocket failed to deploy and lawn-darted. The battery and screw terminal block connectors got more or less torn off, but the rest of the board survived and good data was recovered from the flight. -Repaired by Bdale, sent back to Keith on 7 July 2009. +Repaired by Bdale, sent back to Keith on 7 July 2009. Keith reports the +baro sensor (which is still original) is flakey and needs to be replaced. ## sn 3 ## @@ -39,8 +44,8 @@ flown there. Pulled and given to Keith to take home from Mayhem. -Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not -recovered. Now presumed lost. +Lost in Keith's Nike which was never found after an apparently nominal flight +in June 2009 at Brothers, Oregon. ## sn 4 ## @@ -50,6 +55,9 @@ from each to ground. Installed in Robert's Lil Nuke. +Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and +both it and the electronics sled came out at apogee and were not recovered. + ## sn 5 ## Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial @@ -64,3 +72,16 @@ Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle. Keith's TeleDongle. Keith added acrylic LED light pipes and a LiPo for use in RDF after flgith. + +## sn 7 ## + +Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + +## sn 8 ## + +Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 +to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked +from each to ground. + -- 2.47.2