From: Bdale Garbee Date: Wed, 6 Jul 2011 00:27:34 +0000 (-0600) Subject: update TeleScience status X-Git-Url: https://git.gag.com/?a=commitdiff_plain;h=e01284d226e71ab137c9ca44dfcd15b60b73e667;p=web%2Faltusmetrum update TeleScience status --- diff --git a/TeleScience/index.mdwn b/TeleScience/index.mdwn index b53ede7..f09fd0c 100644 --- a/TeleScience/index.mdwn +++ b/TeleScience/index.mdwn @@ -60,5 +60,10 @@ but no prototypes have been built yet. ## Future Plans ## -We currently plan to build prototypes of TeleScience in Spring 2011. +3 prototypes have been built, of which 2 are installed in +[2YikStik](http://www.gag.com/rockets/airframes/2YikStik/) +which we hope to fly at LDRS 30 in early September 2011. +The thermistor conditioning circuits in the current design are very tightly +coupled to the particular model of EPCOS thermistor that we chose for 2YikStik. +Before we could sell TeleScience, that needs to be addressed somehow.