From: Bdale Garbee Date: Sat, 30 May 2009 20:00:06 +0000 (-0600) Subject: record changes from Mayhem X-Git-Url: https://git.gag.com/?a=commitdiff_plain;h=c44cd4b5a8506241240e499dcd38092bbf820817;p=web%2Faltusmetrum record changes from Mayhem --- diff --git a/TeleMetrum/production.mdwn b/TeleMetrum/production.mdwn index b4e3009..6c6a7d3 100644 --- a/TeleMetrum/production.mdwn +++ b/TeleMetrum/production.mdwn @@ -12,6 +12,8 @@ ground. R17 replaced with short circuit, R18 removed. Installed in Bdale's Vertical Assault. First unit to be flown on 19 April 2009, on a Cesaroni J335. +Moved to Horizon rebuild. + ## sn 2 ## Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory @@ -21,13 +23,23 @@ ground. Delivered to Keith Packard for firmware development and use. Flown twice on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors. +Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload. The +ascent was pretty but the rocket failed to deploy and lawn-darted. The battery +and screw terminal block connectors got more or less torn off, but the rest +of the board survived and good data was recovered from the flight. + +In Bdale's possession for repair. + ## sn 3 ## Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked from each to ground. -Installed in Bdale's Horizon rebuild. +Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never +flown there. + +Pulled and given to Keith to take home from Mayhem. ## sn 4 ##