From: Bdale Garbee Date: Mon, 6 Jul 2009 07:11:18 +0000 (-0600) Subject: update production log X-Git-Url: https://git.gag.com/?a=commitdiff_plain;h=c30f415aa1031d1f155e0914ee648be028076f30;p=web%2Faltusmetrum update production log --- diff --git a/TeleMetrum/production.mdwn b/TeleMetrum/production.mdwn index 6c6a7d3..c8b3073 100644 --- a/TeleMetrum/production.mdwn +++ b/TeleMetrum/production.mdwn @@ -12,8 +12,6 @@ ground. R17 replaced with short circuit, R18 removed. Installed in Bdale's Vertical Assault. First unit to be flown on 19 April 2009, on a Cesaroni J335. -Moved to Horizon rebuild. - ## sn 2 ## Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory @@ -28,7 +26,7 @@ ascent was pretty but the rocket failed to deploy and lawn-darted. The battery and screw terminal block connectors got more or less torn off, but the rest of the board survived and good data was recovered from the flight. -In Bdale's possession for repair. +Repaired by Bdale, sent back to Keith on 7 July 2009. ## sn 3 ## @@ -41,6 +39,8 @@ flown there. Pulled and given to Keith to take home from Mayhem. +Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not recovered. + ## sn 4 ## Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 @@ -54,6 +54,8 @@ Installed in Robert's Lil Nuke. Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial connector for use as TeleDongle or for TeleTerra prototype. +Bdale's TeleDongle. + ## sn 6 ## Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.