From: Bdale Garbee Date: Fri, 7 Jan 2011 07:52:29 +0000 (-0700) Subject: record arrival of new production run of TeleMetrum boards X-Git-Url: https://git.gag.com/?a=commitdiff_plain;h=31d65b30267d439ddc48a91e5f22b44848ab75bd;p=web%2Faltusmetrum record arrival of new production run of TeleMetrum boards --- diff --git a/production.mdwn b/production.mdwn index 57344bc..9899b57 100644 --- a/production.mdwn +++ b/production.mdwn @@ -186,6 +186,12 @@ Went home with Keith from LCA 2010 in Wellington. Full load of TeleMetrum v0.2 PCB on 2010.01.09, with 40g accel and screw terminals. +## sn 54-56 ## + +Prototypes of TeleMetrum v1.1 loaded with the newer Venus 638 chips for +evalutation, loaded as part of the production v1.1 run by +[Advanced Circuits](http://4pcb.com), received 2011.01.06. + ## sn 100-207 ## First production run of 108 pieces of TeleDongle v0.2 by @@ -196,3 +202,8 @@ First production run of 108 pieces of TeleDongle v0.2 by First production run of 54 pieces of TeleMetrum v1.0 by [Advanced Circuits](http://4pcb.com), received 2010.04.08. +## sn 262-366 ## + +Production run of 105 pieces of TeleMetrum v1.1 by +[Advanced Circuits](http://4pcb.com), received 2011.01.06. +