record changes from Mayhem
authorBdale Garbee <bdale@gag.com>
Sat, 30 May 2009 20:00:06 +0000 (14:00 -0600)
committerBdale Garbee <bdale@gag.com>
Sat, 30 May 2009 20:00:06 +0000 (14:00 -0600)
TeleMetrum/production.mdwn

index b4e3009247e5ac2112213a1f4ac9cba4686b34ec..6c6a7d33c5066b9d19c82433b9538d2fea1a3331 100644 (file)
@@ -12,6 +12,8 @@ ground.  R17 replaced with short circuit, R18 removed.
 Installed in Bdale's Vertical Assault.  First unit to be flown on 
 19 April 2009, on a Cesaroni J335.
 
+Moved to Horizon rebuild.
+
 ## sn 2 ##
 
 Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory 
@@ -21,13 +23,23 @@ ground.
 Delivered to Keith Packard for firmware development and use.  Flown twice
 on 10 May 2008 in Keith's Grappler to about 45m on Estes D12-3 motors.
 
+Flew in Keith's Little Dog Dual Deploy at Mile High Mayhem as a payload.  The
+ascent was pretty but the rocket failed to deploy and lawn-darted.  The battery
+and screw terminal block connectors got more or less torn off, but the rest
+of the board survived and good data was recovered from the flight.
+
+In Bdale's possession for repair.
+
 ## sn 3 ##
 
 Full load of v0.1 PCB on 2009.04.22, two cuts and jumps to rewire P1_2 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
-Installed in Bdale's Horizon rebuild.
+Installed in Bdale's Vertical Assault after sn 1 moved to Horizon, but never
+flown there.
+
+Pulled and given to Keith to take home from Mayhem.
 
 ## sn 4 ##