Installed in Bdale's Vertical Assault. First unit to be flown on
19 April 2009, on a Cesaroni J335.
+Successfully flew Bdale's rebuilt Horizon dual-deploy at Hudson Ranch on
+2009.07.18 with a MAWD as backup. The first dual-deploy flight with a TM
+board in control of ejection charges!
+
## sn 2 ##
Full load of v0.1 PCB, two cuts and jumps to rewire P1_2 to be SPI memory
and screw terminal block connectors got more or less torn off, but the rest
of the board survived and good data was recovered from the flight.
-Repaired by Bdale, sent back to Keith on 7 July 2009.
+Repaired by Bdale, sent back to Keith on 7 July 2009. Keith reports the
+baro sensor (which is still original) is flakey and needs to be replaced.
## sn 3 ##
Pulled and given to Keith to take home from Mayhem.
-Flown in Keith's Nike at Brothers, Oregon, in June 2009, and not
-recovered. Now presumed lost.
+Lost in Keith's Nike which was never found after an apparently nominal flight
+in June 2009 at Brothers, Oregon.
## sn 4 ##
Installed in Robert's Lil Nuke.
+Lost at Hudson Ranch 2009.07.18 when we forgot to tape the nose cone on and
+both it and the electronics sled came out at apogee and were not recovered.
+
## sn 5 ##
Partial "ground" load of v0.1 PCB on 2009.04.23 plus beeper and serial
Keith's TeleDongle.
Keith added acrylic LED light pipes and a LiPo for use in RDF after flgith.
+
+## sn 7 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+
+## sn 8 ##
+
+Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked
+from each to ground.
+