inline
| side by side (from parent 1:
87d8625
)
add more notes about TeleScience future
author
Bdale Garbee
<bdale@gag.com>
Fri, 14 Sep 2012 16:11:56 +0000
(10:11 -0600)
committer
Bdale Garbee
<bdale@gag.com>
Fri, 14 Sep 2012 16:11:56 +0000
(10:11 -0600)
TeleScience/index.mdwn
patch
|
blob
|
history
diff --git
a/TeleScience/index.mdwn
b/TeleScience/index.mdwn
index d435a609a1559c06f3fa4a8244d8904c1b8dcccf..26ada2e8647a8d9112fc5fd42181b5a1d286d2c2 100644
(file)
--- a/
TeleScience/index.mdwn
+++ b/
TeleScience/index.mdwn
@@
-68,9
+68,13
@@
but no prototypes have been built yet.
and flown at LDRS 30 in early September 2011. Unfortunately, we experienced a
mechanical failure in the airframe before going fast enough to get exciting
data, but post-flight analysis suggested the TeleScience boards were working
and flown at LDRS 30 in early September 2011. Unfortunately, we experienced a
mechanical failure in the airframe before going fast enough to get exciting
data, but post-flight analysis suggested the TeleScience boards were working
-fine up until "the incident". A replacement airframe is under construction
-that we hope to fly at NCR's 2012 edition of Mile High Mayhem.
+fine up until "the incident". A replacement airframe
+[YikStik3](http://www.gag.com/rockets/airframes/YikStik3/)
+flew successfully at Airfest 18 in September 2012. We appear to have good data
+from the fin can, but not from the nose cone... more details once the data
+analysis is complete.
-The thermistor conditioning circuits in the current design are very tightly
-coupled to the particular model of EPCOS thermistor that we chose for 2YikStik.
-Before we could sell TeleScience, that needs to be addressed somehow.
+The thermistor conditioning circuits in the v0.1 design are too tightly coupled
+to the particular model of EPCOS thermistor that we chose for 2YikStik and
+YikStik3. A major revision of the board is nearing prototype stage in Septmeber
+2012, and will be further documented here soon.