]> git.gag.com Git - web/altusmetrum/commitdiff
record production of three new TM boards
authorBdale Garbee <bdale@gag.com>
Thu, 5 Nov 2009 20:12:46 +0000 (13:12 -0700)
committerBdale Garbee <bdale@gag.com>
Thu, 5 Nov 2009 20:12:46 +0000 (13:12 -0700)
TeleMetrum/production.mdwn

index e213ec04e528808d6f460bfd3ddc241447003950..5e18c8be9f8428f6835d05dd76b6c32a9ef4c29e 100644 (file)
@@ -65,13 +65,15 @@ connector for use as TeleDongle or for TeleTerra prototype.
 
 Bdale's TeleDongle.
 
 
 Bdale's TeleDongle.
 
+Keith added acrylic LED light pipes and a LiPo for use in RDF after fligth.
+
 ## sn 6 ##
 
 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
 
 Keith's TeleDongle.
 
 ## sn 6 ##
 
 Partial "ground" load of v0.1 PCB on 2009.04.23 for use as TeleDongle.
 
 Keith's TeleDongle.
 
-Keith added acrylic LED light pipes and a LiPo for use in RDF after flgith.
+Keith added acrylic LED light pipes and a LiPo for use in RDF after fligth.
 
 ## sn 7 ##
 
 
 ## sn 7 ##
 
@@ -79,6 +81,9 @@ Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
+Pulled from Vertical Assault (never flew there) and taken to Keith in Japan
+in October 2009 as replacement.
+
 ## sn 8 ##
 
 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
 ## sn 8 ##
 
 Full load of v0.1 PCB on 2009.08.08, two cuts and jumps to rewire P1_2 
@@ -91,15 +96,40 @@ Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
+Installed in Bdale's Trick-o-Treat 98mm airframe.
+
 ## sn 10 ##
 
 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
 ## sn 10 ##
 
 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.
 
+Installed in Robert's Lil Nuke.
+
 ## sn 11 ##
 
 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
 
 ## sn 11 ##
 
 Full load of v0.1 PCB on 2009.08.15, two cuts and jumps to rewire P1_2 
 to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
 from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
 
+In G-Spot, this accelerometer recorded 52.8 gee acceleration on a
+Cesaroni pro29 H399 reload at NCR Oktoberfest 2009!
+
+## sn 12 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.  Accelerometer loaded is MMA2204EG 100G unit!
+
+## sn 13 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+
+## sn 14 ##
+
+Full load of v0.1 PCB on 2009.11.05, two cuts and jumps to rewire P1_2 
+to be SPI memory chip select, R14 and R15 loaded with 100k, 27k tacked 
+from each to ground.
+