X-Git-Url: https://git.gag.com/?a=blobdiff_plain;f=doc%2Ftelemetrum.inc;h=7ef9876f6439eeff0dc91b5d011df7a2d1a9fa31;hb=45f7b91ea126f8f9e607a8ee53df655d992590f2;hp=35aec6cc9fd0a3d99d1bb840392eecadbfb9892e;hpb=6d80b89c0bd82133dd5c93df8604f562ac49c19a;p=fw%2Faltos diff --git a/doc/telemetrum.inc b/doc/telemetrum.inc index 35aec6cc..7ef9876f 100644 --- a/doc/telemetrum.inc +++ b/doc/telemetrum.inc @@ -18,7 +18,7 @@ bay for TeleMetrum should have at least 10 inches of interior length. There are two generations of the TeleMetrum design. The - major changes in the v2 generation are: + major changes after v1 generation are: * uBlox GPS chip certified for altitude records @@ -62,14 +62,15 @@ stranded, into the GND hole just above the screw terminal strip and solder it in place. - Connecting the positive battery terminal to the pyro + Connecting the switched positive battery terminal to the pyro charges must be done separate from TeleMetrum, by soldering - them together or using some other connector. - + them together or using some other connector. Note that you + must include a switch in the positive lead from the pyro + battery for safety! The other lead from each pyro charge is then inserted into - the appropriate per-pyro channel screw terminal (terminal 4 for the - Main charge, terminal 6 for the Apogee charge). + the appropriate per-pyro channel screw terminal (terminal 4 + for the Main charge, terminal 6 for the Apogee charge). === Using an Active Switch with TeleMetrum