From edfe2ece95368b4dd488327e95b51bf3f640ca32 Mon Sep 17 00:00:00 2001 From: Bdale Garbee Date: Mon, 22 Oct 2018 16:57:16 -0600 Subject: [PATCH] try again --- rockets/airframes/MehGaNuke/index.mdwn | 10 +++++++--- 1 file changed, 7 insertions(+), 3 deletions(-) diff --git a/rockets/airframes/MehGaNuke/index.mdwn b/rockets/airframes/MehGaNuke/index.mdwn index a98220b..2aa6ccb 100644 --- a/rockets/airframes/MehGaNuke/index.mdwn +++ b/rockets/airframes/MehGaNuke/index.mdwn @@ -183,11 +183,15 @@ deployment bag was not recovered. After studying the zipper and thinking about the main deployment sequence, several changes will be made before the next flight: - - The main airframe tube will be replaced with a tube that's a bit longer (for greater stability), and has an internal 7.5-8" diameter tube instead of the flat baffle to ease main chute deployment. + - The main airframe tube will be replaced with a tube that's a bit longer + (for greater stability), and has an internal 7.5-8" diameter tube instead + of the flat baffle to ease main chute deployment. - - Switch from the ARRD to the largest [Tender Descender](http://www.tinderrocketry.com/l13-tender-descender-tether) for main deployment + - Switch from the ARRD to the largest [Tender Descender](http://www.tinderrocketry.com/l13-tender-descender-tether) for main deployment. - - Add a TeleGPS to the nose assembly so it can be tracked independently, and let it come down under the 2 existing 5-foot chutes. Add a third 5-foot chute to be a dedicated pilot for the 28-foot main chute. + - Add a TeleGPS to the nose assembly so it can be tracked independently, and let + it come down by itself under the 2 existing 5-foot chutes. Add a third 5-foot + chute to be a dedicated pilot for the 28-foot main chute. These changes should reduce the chance of another zipper, and reduce the amount of strap we need to stuff into the bay. -- 2.30.2