X-Git-Url: https://git.gag.com/?p=web%2Fgag.com;a=blobdiff_plain;f=rockets%2Fairframes%2FMehGaNuke%2Findex.mdwn;fp=rockets%2Fairframes%2FMehGaNuke%2Findex.mdwn;h=a98220bdc6b229019b4fb75244e6ce4004653add;hp=d79cb381879a73c2c7351cfd51dbb1d46c6fa07d;hb=0a2358560d6e14572f5dca3b01249c343469a2cf;hpb=b60145e545f2b6b36d7a88591a3f961adf14ccfc diff --git a/rockets/airframes/MehGaNuke/index.mdwn b/rockets/airframes/MehGaNuke/index.mdwn index d79cb38..a98220b 100644 --- a/rockets/airframes/MehGaNuke/index.mdwn +++ b/rockets/airframes/MehGaNuke/index.mdwn @@ -183,16 +183,11 @@ deployment bag was not recovered. After studying the zipper and thinking about the main deployment sequence, several changes will be made before the next flight: - - The main airframe tube will be replaced with a tube that's a bit - longer (for greater stability), and has an internal 7.5-8" diameter - tube instead of the flat baffle to ease main chute deployment. + - The main airframe tube will be replaced with a tube that's a bit longer (for greater stability), and has an internal 7.5-8" diameter tube instead of the flat baffle to ease main chute deployment. - Switch from the ARRD to the largest [Tender Descender](http://www.tinderrocketry.com/l13-tender-descender-tether) for main deployment - - Add a TeleGPS to the nose assembly so it can be tracked - independently, and let it come down under the 2 existing 5-foot - chutes. Add a third 5-foot chute to be a dedicated pilot for the - 28-foot main chute. + - Add a TeleGPS to the nose assembly so it can be tracked independently, and let it come down under the 2 existing 5-foot chutes. Add a third 5-foot chute to be a dedicated pilot for the 28-foot main chute. These changes should reduce the chance of another zipper, and reduce the amount of strap we need to stuff into the bay.